Do I Need a Permit?
Do You Need TRCA Approval for a Shed on an Etobicoke Ravine Lot?
Your shed is small enough that Toronto Building doesn't want a permit. On a lot that backs onto the Humber or Mimico Creek, that may not matter. TRCA and the City's ravine bylaw run on separate rules, and a prefab shed sitting on skids can still count as development. Here's how to tell before the delivery truck shows up.
Key Takeaways
- The Ontario Building Code exemption for small sheds only removes the building permit, and it has no effect on TRCA's permit requirement under the Conservation Authorities Act.
- Placing any structure on TRCA-regulated land counts as development, including a prefab shed on skids or deck blocks, unless TRCA confirms in writing that an exemption applies.
- Toronto's Ravine and Natural Feature Protection bylaw (Municipal Code Chapter 658) can apply separately, because levelling with gravel, adding fill or digging near tree roots inside the protected area needs City approval.
- Where you put the shed matters more than how big it is, so check both the TRCA regulation map and the City's ravine protection map before you buy anything.
Small Shed, Ravine Rules
Yes. A shed small enough to skip a building permit can still need a TRCA permit if it sits on land regulated by the Toronto and Region Conservation Authority, and it can need City approval under Toronto's ravine bylaw too. The Ontario Building Code exemption for small accessory buildings only takes Toronto Building out of the picture. It does nothing for the Conservation Authorities Act or for Chapter 658 of the Toronto Municipal Code, and both of those reach plenty of backyards in Kingsway, Humber Valley Village, Lambton Mills and along Mimico Creek.
Why the 15 square metre exemption stops at the Building Code
Under the Ontario Building Code, a one-storey accessory building with no plumbing and a gross area of 15 square metres or less doesn't need a building permit. That's the rule most homeowners have heard about, and it's accurate as far as it goes. The problem is that people treat it as a general green light. It isn't. It's an exemption from one piece of legislation, administered by one office.
TRCA doesn't care whether Toronto Building wants a permit. Its authority comes from Section 28 of the Conservation Authorities Act, and the test there isn't size or occupancy. The test is location: is the shed going on land within a river or stream valley, a floodplain, an erosion hazard, a wetland, or the allowance around any of those? If so, putting a structure there is regulated, full stop.
The Building Code tells you whether the shed is safe to stand in. TRCA wants to know whether the ground under it is going to stay where it is.
Three separate rulebooks on one Etobicoke backyard
On a typical ravine lot backing onto the Humber, a shed project can touch three different approvals that don't talk to each other. Clearing one tells you nothing about the other two.
TRCA and the Conservation Authorities Act
Since April 2024, TRCA's permits are issued under Ontario Regulation 41/24, which replaced the older authority-specific regulations. The Act defines development broadly, and it includes the construction, erection or placing of a building or structure of any kind. Placing is the word that catches prefab sheds. The 2024 regulation did carve out some exemptions for minor works, but whether a small accessory structure qualifies depends on exactly where it sits relative to the floodplain, erosion hazard or wetland. Get that confirmed by TRCA in writing rather than reading the regulation yourself and hoping.
Toronto's Ravine and Natural Feature Protection bylaw
Chapter 658 is administered by Urban Forestry, and it's a separate permit from TRCA's. Inside the ravine protected area it restricts injuring or removing trees, placing or dumping fill, and altering grade. Trees inside the protected area are covered regardless of size, which surprises people who know the private tree bylaw's diameter threshold. A shed itself isn't really the issue here. The gravel pad, the excavation for a concrete slab, and the roots you cut while levelling are what trip the bylaw.
Zoning
Even permit-exempt sheds have to meet the zoning bylaw for ancillary buildings: height, setbacks from lot lines, and lot coverage. Most of Etobicoke falls under city-wide Zoning By-law 569-2013, but some properties still carry provisions from the former Etobicoke zoning code. If your shed breaks a zoning rule, the fix is a minor variance at the Committee of Adjustment, and the Committee will circulate TRCA anyway.
Where the regulated line actually falls on Humber and Mimico Creek lots
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
Here's what the housing stock looks like in practice. In Kingsway and Humber Valley Village, many of the larger lots west of the Humber run back to a top of bank, then drop steeply into the valley. The house sits on the tableland, and the rear yard is a mix of flat lawn and slope. The regulated area usually doesn't start at the bottom of the hill. It starts at the hazard (the top of the slope, or the long-term stable slope line where the bank is eroding) and then extends an allowance back toward the house. That allowance often covers the exact flat spot at the back of the lawn where people want a shed.
Lower down the Humber, around Old Mill and Lambton, the issue is more often flooding than slope. Parts of the valley were reshaped after Hurricane Hazel, and the regulatory floodplain still governs what can go where. Along Mimico Creek, through Islington Village and the area around Tom Riley Park, lots back onto a narrower, more incised valley with a lot of mature canopy, so the ravine bylaw tends to bite as hard as TRCA. Further west, Alderwood and Markland Wood sit near Etobicoke Creek, which is also TRCA territory, with the same logic.
The point is that you can't eyeball it. A yard that looks entirely flat can be inside the regulated area because the allowance is measured from a line you can't see from your patio.
What counts as development: skids, gravel and deck blocks
Homeowners regularly assume a shed that isn't anchored is temporary and therefore exempt. TRCA doesn't see it that way. These are the scenarios we see most often, and how they tend to be treated:
- A prefab resin or wood shed on skids sitting on existing grass: still the placing of a structure on regulated land, so expect TRCA to want to review it unless it confirms an exemption.
- A shed on a compacted gravel pad: adds fill and alters grade, which engages both TRCA and, inside the ravine protected area, Chapter 658.
- A poured concrete slab: excavation, fill and an impervious surface, the hardest version to get approved near a slope.
- Deck blocks or helical piles: less ground disturbance, but still a structure, and digging for footings near trees can count as root injury.
- Running power to the shed: an ESA permit for the electrical work, plus trenching that may cross tree root zones.
The lightest-touch option, skids on existing grade with no levelling, is usually the easiest to approve. It isn't automatically approved. It's just easier.
How the sign-off actually works, step by step
For a small shed the process is short compared with an addition, but the order matters. Doing it backward is how people end up buying a shed they can't legally place.
- Check the TRCA regulation mapping and the City of Toronto ravine and natural feature protection map for your address. If you're outside both, you're down to zoning.
- If you're inside or near either line, contact TRCA's planning and permits staff with your address and a sketch. They can tell you whether the proposed location is regulated and whether a permit or exemption applies.
- Prepare a site plan showing the shed footprint, dimensions, distance to the top of bank and rear lot line, and any trees nearby. A survey makes this much more convincing than a hand drawing. On some lots TRCA staff will stake the top of bank on site.
- If trees are within the work area, or you're altering grade inside the ravine protected area, apply to Urban Forestry under Chapter 658. An arborist report may be requested.
- Confirm zoning compliance for height and setbacks, and build only after you have the TRCA permit or written confirmation that none is required.
Fees, review timelines and submission requirements change, so confirm current details with TRCA and the City before you rely on any of them. At PermitsHub we prepare the site plan with top of bank and tree locations clearly dimensioned, because a vague sketch is the most common reason a simple shed review stalls.
What happens when the shed goes up first
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
A lot of ravine sheds come to light years later, usually when the owner applies for something bigger. Someone files for a rear addition or a garden suite, TRCA reviews the survey, and there's an unpermitted shed sitting at the top of the slope. Now the shed is part of the conversation for the larger project, and TRCA can ask for it to be relocated or removed as a condition of moving forward.
Complaints are the other trigger. Ravine neighbours tend to watch the valley closely, and a delivery crew levelling ground near the bank gets noticed. TRCA and the City both have enforcement powers, including orders to remove structures and restore the site, and restoration of a disturbed slope or damaged trees typically costs meaningfully more than the shed did. Home sales surface it too: a buyer's lawyer or the buyer's own planner spots an accessory structure in a regulated area and asks for proof it was approved.
Siting choices that keep a ravine shed simple
On most of the Etobicoke ravine lots we've worked on, the biggest decision is placement, not product. A few patterns consistently make approvals easier:
- Put the shed closer to the house and to the side yard rather than at the back of the lawn near the bank, ideally outside the regulated allowance entirely.
- Choose a spot that's already flat so you don't need fill, retaining or a levelled pad.
- Keep well clear of tree trunks and canopy driplines. Roots on ravine lots extend further than people expect.
- Pick a foundation that sits on grade (skids or a low-impact base) over a poured slab.
- Keep the footprint and height within the zoning limits so you aren't adding a Committee of Adjustment application on top of everything else.
If the only workable spot is inside the regulated area, it isn't necessarily a no. TRCA approves small structures where the risk is low and the slope isn't affected. It just needs to see the plan first. If you want a second set of eyes before you commit, PermitsHub can check your lot against both maps and tell you which approvals your proposed location actually triggers.
Do I Need a Permit?
What are you planning to build or renovate?
Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.