Do I Need a Permit?
Do I Need a Permit for a Shed in Richmond Hill? Size and Setback Rules
In Richmond Hill, a detached shed of 15 m² or less with no plumbing usually doesn't need a building permit. It still has to meet zoning for height, setbacks and lot coverage, and on Oak Ridges Moraine or conservation-regulated lots it may face provincial limits too. Here's how to check before the slab goes in, not after a neighbour calls bylaw.
Key Takeaways
- Under the Ontario Building Code, a detached shed with a building area of 15 m² or less and no plumbing generally doesn't need a building permit in Richmond Hill, but anything larger does.
- Zoning applies to every shed regardless of size, so height, setbacks from lot lines, location in the yard and total lot coverage all have to comply even when no permit is issued.
- Lots on the Oak Ridges Moraine or inside a TRCA regulated area can face restrictions on placing any new structure near natural features, and those limits sit above the municipal zoning by-law.
- On larger lots such as Bayview Hill, a big accessory building can use up the lot coverage you'd need for a future garden suite, so plan the two together.
Richmond Hill Shed Rules
In Richmond Hill, a detached shed doesn't need a building permit if its building area is 15 square metres or less and it has no plumbing. Anything over 15 m², or any shed with plumbing, needs a permit. Skipping the permit doesn't excuse you from zoning, though. Every shed, even a small kit from a big-box store, still has to meet Richmond Hill's zoning rules for height, distance from the lot lines, where it sits in the yard and how much of the lot is covered. On lots north of Bloomington Road, provincial Oak Ridges Moraine rules can apply on top of all that.
Most of the shed problems we see in Richmond Hill aren't about the permit at all. The shed was legal under the Building Code but sat too close to the fence, stood too tall, or went onto a part of the lot the zoning or the province treats differently. Here's how each layer works.
What the 15 square metre threshold actually measures
The Ontario Building Code exemption is based on building area, which means the footprint measured to the outside face of the exterior walls. Floor area doesn't count and neither does the roof. The rough imperial equivalent is about 161 square feet. That's where homeowners get caught by catalogue sizes.
- A 10 by 12 foot shed is about 11.1 m², comfortably under the threshold.
- A 10 by 16 foot shed is about 14.9 m², just under, with almost no margin if the walls are thicker than the listing suggests.
- A 12 by 16 foot shed is about 17.8 m², which needs a building permit.
- A 12 by 12 foot gazebo or pavilion with a solid roof is about 13.4 m², under the threshold but still an accessory structure for zoning purposes.
The exemption only covers detached buildings. A lean-to fixed to the house wall is an addition and needs a permit at any size. Plumbing removes the exemption entirely, so a small pool cabana with a sink or a washroom needs a permit even if it's tiny. Electrical work is a separate matter. Running power to any shed requires an Electrical Safety Authority (ESA) permit and inspection, whatever the size of the building. Building Code rules do change between editions, so confirm the current exemption with Richmond Hill Building Services before you order a kit at the edge of the limit.
The Building Code tells you whether you need a permit. Zoning tells you whether the shed can be there at all, and zoning has no size exemption.
The zoning rules that apply to every shed in Richmond Hill
Richmond Hill doesn't have one simple shed rule for the whole town. Different neighbourhoods are governed by different parent zoning by-laws, many of them amended over decades, and some subdivisions carry site-specific exceptions. So a shed that's fine on a 1970s lot in Crosby can be a problem on a newer lot in Jefferson. The rules usually cover the same five things, but the numbers vary by zone.
Location in the yard
Accessory buildings are generally limited to the rear yard and, in some zones, the interior side yard. They're almost never allowed in the front yard. Corner lots are where this trips people up. The side of the house facing the flanking street is an exterior side yard, and sheds are usually restricted there even though it feels like a back corner. Plenty of corner-lot owners in Richmond Hill put a shed against the side fence by the street and learned that the hard way.
Setbacks from lot lines
Most zones let a small accessory building sit fairly close to the rear and side lot lines, but rarely right on them. The required distance depends on your zone and sometimes on the shed's height. Measure to the closest point of the structure, which is often the roof overhang, not the wall. A shed placed tight against the fence with eaves dripping onto the neighbour's side is the textbook complaint, and the one most likely to bring a bylaw officer out.
Height
Accessory buildings carry their own height cap, usually much lower than the house. Some by-laws measure to the peak and others to the midpoint of a sloped roof, so a tall gambrel-style shed can comply under one method and fail under the other. Taller sheds sometimes need to sit further from the lot lines.
Lot coverage
The shed's footprint counts toward the lot's maximum coverage, together with the house, an attached or detached garage and, in many by-laws, covered porches. Some zones also cap the total area of all accessory buildings combined. On lots where an addition has already used up the coverage, even a small shed can tip you over. Two small sheds don't get around this: each may be under 15 m² for Building Code purposes, but zoning adds them together.
If your shed breaks a zoning rule and you want to keep it where it is, the route is a minor variance through Richmond Hill's Committee of Adjustment. That means notice to neighbours, a public hearing, and a decision that can be appealed. It's a lot of process for a garden shed, which is why checking the zoning before the base goes in is the cheapest step in the whole project.
Oak Ridges Moraine lots north of Bloomington Road
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
Much of Richmond Hill north of Bloomington Road, including the Oak Ridges community and the land around Lake Wilcox, Bond Lake and Philips Lake, falls under the Oak Ridges Moraine Conservation Plan. That's a provincial plan, and municipal zoning has to conform to it. What it means for your shed depends on how your lot is designated and what's nearby.
Lots inside the Oak Ridges settlement area are usually treated much like ordinary urban lots, and the town zoning does most of the work. Where it gets restrictive is near key natural heritage features and hydrologically sensitive features: wetlands, streams, kettle lakes, significant woodlands and their surrounding protection zones. The plan sets minimum vegetation protection zones around these features, and new structures inside them are tightly limited. A homeowner backing onto a woodlot or a wet area along a ravine can find that the obvious spot at the back of the yard is the one place they can't build, permit or no permit.
Moraine lots also tend to come with site-specific zoning that limits impervious surfaces, and a shed on a concrete slab adds to that total. If your lot is close to those limits because of a driveway, a patio or a past addition, a large shed can be the thing that pushes it over. Gravel bases and skid foundations are sometimes treated differently from slabs, so confirm how your by-law counts them before choosing.
Conservation authority limits and easements
Separately from the Moraine plan, a lot of Richmond Hill sits within areas regulated by the Toronto and Region Conservation Authority (TRCA) because of nearby valleys, floodplains and watercourses. The Rouge and Don systems run through the town, and backyards in neighbourhoods like Mill Pond and parts of Oak Ridges slope down toward regulated land. If your lot is in a regulated area, placing a structure or regrading may need conservation authority permission even when the Building Code doesn't call for a permit. TRCA publishes regulation mapping, and the town's zoning staff can usually tell you whether your property is affected.
Then check your survey for easements. Many subdivision lots carry rear-yard drainage or utility easements, and putting a shed on one can mean it has to come out at your expense when the utility or the town needs access. Rear-yard swales are part of the approved lot grading plan. A shed that blocks a swale sends water toward your house or the neighbour's, and grading complaints are among the most common shed disputes we hear about.
Bayview Hill: big accessory buildings and future ARU plans
Bayview Hill is a different case. The lots are large, the homes are big, and owners often want something well past a garden shed: a pool house, a cabana with a washroom, a workshop or a detached garage at the back of the property. All of these need building permits, either because they're over 15 m² or because they have plumbing. They also take up lot coverage on lots where the house is often already near its zoning maximum.
The longer-term issue is additional residential units. Ontario now lets most serviced residential lots hold more than one unit, including one in a detached accessory building. Richmond Hill applies its own zoning rules to how large that building can be, where it goes, and how emergency access to it is provided. Picture a large pool house built today in the spot a garden suite would need, using the remaining coverage and possibly blocking the clear path from the street. It can quietly take the option off the table. If a garden suite for a parent or adult child is even a maybe in the next decade, design the accessory building with that in mind, or design it as the future suite from the start. We've done zoning reviews on Bayview Hill lots where this sequencing decided whether the second unit was possible.
On a big lot, the most expensive shed is the one that ends up sitting where your future garden suite needed to go.
What a shed permit application looks like in Richmond Hill
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
When a shed or accessory building is over the threshold, the application goes to Richmond Hill Building Services and is reviewed for zoning compliance and Building Code compliance. Examiners generally expect the following.
- A site plan based on your survey, showing the shed's footprint, dimensions, distances to every lot line and the house, and existing coverage calculations.
- Floor plan, elevations and a cross-section showing wall and roof framing, roof slope and overall height measured the way your by-law requires.
- Foundation details, whether that's a slab, piers or footings, since examiners look closely at frost protection on larger buildings.
- Plumbing drawings if there's any water or drainage, plus details of the connection to the house services.
- Any conservation authority clearance or Moraine-related approval needed before the town will issue the permit.
The most common reasons we see drawings sent back are an incomplete site plan (missing setbacks or a coverage figure), height measured to the wrong point, and foundation details that don't match the building's size. Prefab kit drawings from the manufacturer often lack what the examiner needs, especially for snow load and the foundation. PermitsHub prepares the site plan and construction drawings, runs the zoning check before submission and handles the examiner's comments, which is usually where the time goes.
After the permit is issued, expect inspections at the stages listed on the permit, typically foundation or footings, framing, and a final. Plumbing gets its own inspections. Don't close in the walls before framing is inspected. Opening finished walls for an inspector is the one avoidable delay we see on almost every self-managed accessory building.
A five-minute check before you buy the shed
- Measure the outside footprint of the shed you want and convert to square metres, including any attached covered area.
- Pull your survey and mark the spot, the lot lines, any easements and any rear-yard swale.
- Confirm your zone and the accessory building rules for it with Richmond Hill zoning staff, including height method, setbacks and coverage.
- If you're north of Bloomington Road or back onto a ravine, woodlot or watercourse, ask about Oak Ridges Moraine designations and check TRCA regulation mapping.
- If you might add a garden suite later, sketch where it would go before you commit the space to a shed.
Almost every shed dispute we've seen could have been avoided by this check. The permit question takes thirty seconds. The zoning and provincial questions are where the real answer is.
Do I Need a Permit?
What are you planning to build or renovate?
Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.