PermitsHubPermitsHub
Permit Service

Deck Permit

PermitsHub handles your deck building permit application, drawings, and approval in Toronto and the GTA.

Deck Permit project completed in Toronto - permit drawings by PermitsHub
What it covers

Scope of service.

Building a new deck or replacing an existing one in Toronto or the GTA requires a building permit. Deck permits ensure your structure meets Ontario Building Code requirements for structural safety, guardrail heights, footing depths, and load capacity. The City of Toronto and most GTA municipalities require permits for decks higher than 24 inches (600mm) above grade, or any deck attached to your home regardless of height. Permit applications require site plans, structural drawings showing joist sizing and spacing, footing details, and guardrail specifications. Municipal reviewers check that your deck complies with setback requirements from property lines, doesn't exceed lot coverage limits, and meets zoning bylaws. PermitsHub prepares all required drawings and documentation, submits your application, and manages the approval process so you can focus on planning your outdoor space.

  • New deck construction attached to or freestanding from your home
  • Deck replacement where existing footings or structure are being changed
  • Elevated decks, ground-level decks, and multi-level deck systems
  • Structural drawings showing joists, beams, posts, footings, and connections
  • Guardrail and stair details meeting Ontario Building Code height and spacing requirements
  • Site plans showing deck location, setbacks, and property line distances
SPEC SHEETS-01

Who needs this

You need a deck permit if you're building a new deck higher than 24 inches above grade, any deck attached to your house, or replacing an existing deck where you're changing the structure or footings. Ground-level freestanding decks under 24 inches typically don't require permits, but setback rules still apply.

Included as standard

  • City-compliant permit drawings
  • Zoning & by-law review
  • Application submission
  • Revision management
Get a free quote
How it works

Four steps to an approved permit.

STEPP-01

01

Consultation

Free scoping call to review your project, lot and goals. No pressure, no fee.

DRAWINGS · ZONING · APPROVAL
STEPP-02

02

Drawings & Zoning

City-compliant permit drawings and full zoning compliance review.

DRAWINGS · ZONING · APPROVAL
STEPP-03

03

Submission

Application filed with the City. We manage every revision round to closure.

DRAWINGS · ZONING · APPROVAL
STEPP-04

04

Permit Approved

Stamped permit in hand. Ready to build with confidence.

DRAWINGS · ZONING · APPROVAL

Express City fast-lane available for eligible small residential projects - timeline depends on project type and City queue

Frequently asked

Deck Permit - your questions

Get started

Ready to start your deck permit?

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT