PermitsHubPermitsHub

ADUs

Smoke and CO Alarm Interconnection When You Add a Second Unit in Ontario

When your house becomes two units, a smoke alarm going off in the basement has to sound upstairs too, and the reverse. That one rule drives most alarm decisions on the job: running wire through plaster ceilings, choosing a wireless system, and placing CO alarms around a shared furnace or attached garage. Here is how it works in practice and what inspectors test before they sign off.

By PermitsHub Team9 min read

Key Takeaways

  • Once a house has a second unit, the smoke alarms must be interconnected so that an alarm in either unit, or in a shared space, sounds in both units.
  • CO alarms are driven by fuel-burning appliances and attached garages, so a basement suite next to a shared gas furnace room usually needs its own CO alarms even if the suite has no gas appliance of its own.
  • The hard part is usually the existing upper floors, and the choice between fishing wire through finished ceilings and using alarms listed for wireless interconnection should be confirmed with your plan examiner before drywall goes up.
  • Inspectors test interconnection in both directions with the test button, so mixed brands, battery-only units upstairs and alarms that cannot talk to each other are the most common reasons for a failed final.

Two Units, One Alarm

Yes. Once an Ontario house contains a second unit, the Building Code requires the smoke alarms to be interconnected so that an alarm going off in either unit sounds in both units, including any shared spaces like a common laundry, furnace room or stairwell. Smoke alarms go on every storey, in each bedroom and in the hallway serving the sleeping areas. Carbon monoxide alarms go next to each sleeping area in any unit with a fuel-burning appliance, or one that sits beside a gas furnace room or an attached garage. For work done under a permit, expect the alarms to be wired to the house's electrical supply with battery backup, and expect the inspector to test the interconnection from both sides.

Why one house becomes one alarm system

In a single-family house, interconnection is about the people inside one home hearing a fire on another floor. Add a second unit and the logic changes. The tenant downstairs may be asleep behind a locked door while a fire starts in the owner's kitchen above, or the reverse. Fire separations slow smoke and flame, but they are built to buy time, not to warn anyone. The interconnected alarm is the warning.

So the Code treats the smoke alarms in a house with a secondary suite as one network. Any alarm that trips, in either unit or in a common area, has to set off the rest. This is separate from the fire separation requirements, and it's one of the few places where the existing upper floors get pulled into a basement suite permit even when you're not renovating them. Plenty of owners plan a basement-only project and only find out at the drawing stage that the second floor bedrooms are part of the alarm scope too.

Owners budget for the basement and forget that the alarm in the upstairs hallway is now part of the suite permit. The inspector will walk up there with a ladder.

Where each smoke alarm goes, unit by unit

Your drawings should show every alarm location, and examiners do check them against the floor plans. A typical two-unit layout for a detached house or semi in Toronto, Mississauga or Vaughan looks like this:

  • New basement unit: one alarm in each bedroom, one in the hallway or area between the bedrooms and the rest of the suite, and at least one on the storey if the layout is open.
  • Existing upper unit: at least one alarm on every storey, including the main floor and the second floor, placed in the hallway outside sleeping rooms. Many examiners also ask for alarms in existing bedrooms, so confirm the expectation for your municipality.
  • Shared spaces: an alarm in a common laundry or furnace room, and in a shared stair or vestibule if both units use it to exit.
  • Every one of these tied into the same interconnected network.

Placement inside each room matters as much as the count. Mount alarms on the ceiling or high on a wall, following the manufacturer's spacing instructions. Keep them away from the kitchen range, bathroom doors and the supply registers of a forced-air system, because nuisance alarms are the fastest way to get a tenant pulling batteries. Basement suites with a kitchenette tucked beside the hallway are the usual trouble spot. Shifting the hallway alarm a short distance toward the bedrooms often solves it, and it's easier to fix on paper than after the box is cut.

Stairs and split levels

Backsplits and sidesplits, common across North York, Scarborough and older parts of Markham, cause confusion because each half-level can count as a storey. Show an alarm on each level and don't rely on one alarm at the top of a short run of stairs to cover two floors. If the basement stair is shared, an alarm at the top of it, on the common side, usually does double duty for both units.

CO alarms: what triggers them and where they go

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Carbon monoxide alarms aren't required in every house. They are triggered by two things: a fuel-burning appliance (a gas furnace, gas water heater, gas fireplace, gas dryer or wood stove) or an attached garage. In a two-unit house you have to think about this unit by unit, because the appliance often sits in one place and the bedrooms it threatens are somewhere else.

The common GTA scenario is a basement suite next to a furnace room that serves the whole house. The suite may be all-electric, but the gas furnace and water heater are on the other side of its wall. That suite needs CO alarms adjacent to its sleeping areas. In practice you'll also want one in the furnace room itself, which the Code expects where the appliance room serves more than one suite. The upper unit needs CO alarms by its bedrooms too, because it shares the same mechanical system.

Attached garages

An attached garage triggers CO alarms in any unit next to it, even if the house has no gas at all. This catches people with suburban two-storey houses in Oakville, Richmond Hill and Vaughan, where the basement suite bedroom often sits right under or beside the garage. Car exhaust works its way through the shared wall and the rim joist, so the alarm goes by the bedroom on the garage side. If you're converting part of the garage into living space, the remaining garage still counts.

Most installers use combination smoke and CO alarms near bedrooms, which cuts the number of devices and keeps everything on one interconnected loop. Check that the combination units are listed for both functions, and use dedicated smoke alarms in places where CO isn't needed and a combination unit would just add cost.

Getting wire to the existing floors without gutting ceilings

The basement is the easy part. During a suite conversion the ceiling is open, the framing is exposed and the electrician can run the alarm circuit and interconnect conductor wherever they like. The upstairs is different. Finished ceilings, plaster and lath in pre-war houses, and joists that run the wrong way for where the hallway alarm needs to sit.

Experienced electricians usually manage with less damage than owners expect. The top floor is reached from the attic, where wire can be dropped to each new box. The main floor is reached from the open basement ceiling below, through the wall cavity near the stair or a closet. The middle floor of a three-storey house is the real problem, because there's nothing open above or below it. That's where you see small access holes patched afterward, a run through a closet, or the wireless route covered in the next section.

Two things to watch. Any wire that passes through the new fire separation between units needs to be properly firestopped at the penetration, and the inspector will look. And the alarm wiring is electrical work that needs its own ESA notification and inspection, separate from the building permit. Leaving the ESA permit open is one of the more common reasons a building final gets delayed, because the building inspector may want to see that the electrical side has passed before closing out the suite.

Wireless interconnection: when it works and when to ask first

Alarms that interconnect by radio signal instead of a wire are now widely available, and they're the obvious answer for an upper floor where fishing wire would mean opening every ceiling. The approach most often accepted keeps each alarm hardwired to the electrical supply for power, with battery backup, while the alarms talk to each other wirelessly. That way you only need power at each location, which can often be picked up from a nearby light fixture box, instead of running a continuous interconnect conductor through the whole house.

What usually isn't accepted for new work under a permit is a set of battery-only alarms upstairs that happen to communicate wirelessly. Treatment of existing buildings varies, and the Code's provisions for alterations to existing houses give examiners some room. That's exactly why you should settle it before rough-in. Put the proposed interconnection method on the drawings, name the alarm product line, and get the examiner to accept it during plan review, not at final inspection. When PermitsHub prepares suite drawings, we note the alarm layout and interconnection approach directly on the plans for this reason, so the question gets answered while it's still cheap to change.

Wireless alarms only help if every unit in the house is from the same compatible system. Two brands on two floors is two separate alarm systems, and the inspector will find out in about ten seconds.

Compatibility is the practical trap. Wireless interconnection is almost always proprietary, so an owner who bought one brand for the basement and another for upstairs ends up with alarms that each work and never hear each other. Some systems also offer a bridge module that lets a wired network talk to wireless units. That can be a good way to tie a fully wired basement to wireless upper floors, as long as the parts are listed to work together.

How the inspector tests it, and what fails

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

At the final inspection for a secondary suite, the alarm check is quick and very literal. The inspector presses the test button on an alarm in the basement unit and listens for the upper unit. Then they go upstairs, press a test button there, and someone listens in the basement. They'll also check CO alarm locations against the bedrooms and the furnace room, and look at the alarms to confirm they're the right type. Across the suites we've taken through final in Toronto's east end and in Etobicoke, the failures repeat:

  • Upper floor alarms are old battery-only units that were never replaced, so pressing test in the basement produces silence upstairs.
  • Mixed brands or incompatible wireless systems between the two units.
  • No CO alarm in the basement suite because the owner assumed the all-electric suite didn't need one, even though it shares a wall with the gas furnace.
  • Missing alarm in a shared furnace or laundry room.
  • An alarm mounted beside the suite kitchen that has already been disabled by the tenant or owner.
  • The ESA inspection for the alarm wiring not yet completed.

Each of these means a reinspection, and if the suite is about to be rented, every reinspection pushes back your rental date. Buy matching alarms for the whole house at the same time, install them as one system, and test them yourself from both units before you book the final.

Existing two-unit houses and the Fire Code

Everything above assumes you're creating the second unit under a building permit, where the Building Code governs. If you've bought a house that already has an older second unit, the Ontario Fire Code has its own retrofit section for existing two-unit houses, and municipal fire services enforce it. Its alarm rules are close in spirit (interconnected smoke alarms across both units, CO alarms where triggered) but the details and acceptable alternatives aren't identical. If a fire inspector has visited, or you're legalizing an existing unit through a permit, confirm which set of rules applies to your situation before you buy hardware. Getting a free PermitsHub review of the existing layout is a fast way to find out what has to change and what can stay.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

ADU / Garden Suite Eligibility

What type of property do you have?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

ADUs

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT