PermitsHubPermitsHub

Basements

Do New Basement Units in the GTA Need Radon Protection Under Ontario Code

Most GTA municipalities are not on the Ontario Building Code's list of places where soil gas control is mandatory. That doesn't settle the question for a new basement unit. Underpinning, a fresh slab, sump pits and a tenant sleeping below grade all change the picture. A rough-in during the slab pour is the cheapest radon insurance you'll ever buy.

By PermitsHub Team9 min read

Key Takeaways

  • In most of the GTA, the Ontario Building Code does not make full soil gas control mandatory for a new basement unit, so your permit can be approved without a radon system.
  • Underpinning or lowering a basement means a new slab, and that pour is the only time a sub-slab radon rough-in is close to free compared with retrofitting later.
  • A proper rough-in is a clear stone layer, sealed polyethylene, a capped and labelled pipe stub through the slab, and a sealed sump lid. It goes on the drawings so the inspector sees it before the concrete goes in.
  • The only way to know your actual radon level is a long-term test of at least three months, ideally over the heating season, after the unit is finished and occupied.

Radon Below Grade

In most of the GTA, no. The Ontario Building Code only makes full soil gas control mandatory in municipalities listed in its supplementary standard on soil gas, and Toronto, York, Peel and Halton municipalities generally aren't on that list. Your basement apartment can get a permit and pass final inspection without a radon system. But if you're underpinning, pouring a new slab or putting a bedroom below grade, a sub-slab radon rough-in is worth installing during the pour. It costs a small fraction of a retrofit and leaves you ready if a long-term test comes back high.

What the Ontario Building Code actually says about soil gas

The soil gas rules sit in Part 9 of the Building Code, in the section dealing with dampproofing, waterproofing and soil gas control. For years that was Subsection 9.13.4, backed by Supplementary Standard SB-9. The structure is simple. If your property is in a location identified as having a soil gas problem, the floor and walls in contact with the ground need a continuous air barrier system, and the slab has to be built so a depressurization system can be added later. If you're outside those areas, those specific requirements don't kick in.

The list is short and leans heavily toward parts of eastern and northern Ontario. Plan examiners at Toronto Building, Vaughan, Markham or Mississauga don't ask for radon details on a typical basement suite, because the code doesn't require them there. Section numbers and the location list can shift between code editions, so if your project straddles a code change or sits near a municipal boundary, confirm with the building department or have your designer check the edition your permit falls under.

Not being on the list doesn't mean the slab is a free-for-all. The code still expects moisture protection under a basement floor, and in practice that means polyethylene under the slab and sensible detailing at the edges. That sheet goes a long way toward a radon rough-in already, which is part of why adding the rest costs so little.

Why a new basement unit changes the radon picture

Radon is a radioactive gas that comes out of the ground as uranium in soil and rock breaks down. Health Canada's national surveys have found elevated readings in homes in every province, the GTA included. The region averages lower than places like parts of the Ottawa Valley, but averages don't tell you what's under your house. Two houses on the same street can test very differently.

A secondary suite stacks several risk factors at once.

  • Underpinning or a bench footing means breaking out the old slab, digging into undisturbed soil and pouring new concrete. You've opened fresh pathways right where people will live.
  • Sump pits are open holes into the drainage layer under the slab. An unsealed pit lid is one of the biggest soil gas entry points we see in finished basements.
  • New service penetrations for plumbing rough-ins, floor drains and sewer backwater valves each add a joint in the slab that needs sealing.
  • A tenant's bedroom is below grade. Someone sleeping eight hours a night in the lowest part of the house has far more exposure than a homeowner who used the basement for laundry and storage.
  • Separate HVAC or a dedicated HRV for the suite can change basement air pressure. Pressure is what pulls soil gas through cracks, so a poorly balanced system can make readings worse.

Old Toronto houses with original basements in the Annex, Leslieville or the Junction often have cracked, patchy slabs with plenty of leakage paths. They tend to vent through a drafty house. Once you underpin, insulate, air seal and add new windows, the building gets tighter and the basement air turns over more slowly. Better energy performance and higher radon readings can arrive together.

The tighter you make a basement suite, the more the slab matters. You can't air seal your way out of a radon problem if the gas is coming up from below.

The slab pour is your one cheap window

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Everything about radon protection comes down to timing. Before the concrete goes in, a rough-in is a few lengths of pipe, some clear stone you may be placing anyway, and an hour of extra labour. After the concrete goes in, adding a sub-slab system means coring through the slab, digging a suction pit by hand under a finished floor, and running a vent pipe through living space or out a wall.

On underpinning jobs, the slab is usually poured late, after the footings, walls, underslab plumbing and drainage are done. Crews are often under pressure to close it up and move on. If the rough-in isn't on the drawings and nobody mentioned it on site, it gets missed, and you find out a year later when the test kit reads high.

If you're just finishing a basement and keeping the existing slab, the decision changes. There's no pour, so the cheap window doesn't exist. In that case the sensible move is to seal the obvious paths (sump lid, floor drain, cracks, the gap where the slab meets the wall), finish the unit, test, and only install a full system if the numbers call for it.

What a sub-slab rough-in looks like on drawings and on site

A rough-in isn't a radon system. It's the passive groundwork that makes an active system easy to add. Done properly it has four parts.

A permeable layer under the slab

A continuous bed of clear crushed stone, with no fines, lets air move freely under the slab so one suction point can draw from the whole floor. Many underpinning details already call for clear stone over the drainage system. The point is to keep it continuous and keep fines from getting mixed in when crews backfill around new footings.

A sealed soil gas barrier

Polyethylene goes over the stone with laps overlapped and taped, and the edges carried up at the walls and sealed. Inspectors who look at underslab poly before a pour mostly check that it's there. They rarely check the laps. Torn poly around pipe penetrations is common, and it's worth a five minute walk around before the concrete truck arrives.

A capped, labelled pipe through the slab

A vertical pipe, typically 100 mm, sits in the stone layer, rises through the slab, and is capped and clearly labelled as a soil gas rough-in. Put it where a future fan and vent can run without wrecking the suite. A mechanical room or a closet next to an exterior wall is ideal. The middle of the tenant's living room is not.

Sealed openings

The sump pit gets a gasketed, bolted lid. Floor drains get a trap primer or a soil gas trap so they don't dry out and become an open vent. The joint between slab and foundation wall is sealed with a flexible sealant. Every plumbing penetration gets sealed too.

When PermitsHub prepares basement suite drawings for an underpinning job, we show the rough-in on the foundation plan and the slab section so it's part of the permit set. That way the contractor prices it, the inspector sees it during the pre-pour visit, and nobody can say later it wasn't in the scope.

Rough-in now or retrofit later: how the costs compare

We won't put numbers on it, because pricing varies by contractor, access and what the slab design already includes. The comparison holds on every job we've seen, though. On a new slab, the rough-in is a minor line item, mostly material you may already be buying plus a bit of labour and sealing. A full active system installed later, with a fan, vent stack and manometer, costs meaningfully more. Retrofitting through a finished suite costs more again, because you're paying for coring, patching and finish repairs, and possibly working around a tenant.

The biggest cost driver on a retrofit is usually the vent route, not the fan. Running a stack up through a finished three-unit house, or out a side wall where the setback to a neighbour's window is tight, is where the hours go. A rough-in placed with that route in mind takes most of that pain away.

There's a resale and rental angle too. Buyers and tenants are asking about radon more often, and a home inspector who spots a labelled rough-in can tell the slab was built with care. It's a small detail that signals the whole suite was done properly.

What long-term testing shows after the unit is occupied

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Short-term test kits that run a few days are fine for curiosity, but Health Canada recommends a long-term test of at least three months, ideally during the heating season when windows are shut and the stack effect pulls hardest on the basement. Radon levels swing a lot from day to day and season to season, and a weekend reading in July can badly understate what a tenant breathes in January.

Health Canada's guideline is 200 becquerels per cubic metre. Above that, it recommends fixing the problem, and the higher the number, the sooner. Test in the lowest lived-in room, which in a basement suite usually means the bedroom, at breathing height and away from exterior walls, windows and the furnace.

In the GTA basement units we've followed after occupancy, most land comfortably under the guideline. A minority don't, and you can't reliably predict which from the street, the age of the house or the neighbour's result. When a home with a rough-in tests high, the fix is usually quick: a C-NRPP certified mitigation professional connects a fan to the existing pipe, routes the vent, adds a gauge, and you retest to confirm the drop. Without a rough-in, the same result means a larger, messier job inside a suite someone already lives in.

Test once the suite is finished, the HVAC is balanced and the space is lived in. Testing an open construction site tells you very little, because the house isn't behaving the way it will once it's sealed and occupied.

A quick decision framework for your project

  • Underpinning, lowering, or pouring any new slab: install the rough-in. The cost is minor and the window closes the day the concrete goes in.
  • Keeping the existing slab: seal the sump, drains, cracks and perimeter joint, finish the unit, then run a long-term test.
  • Property in a municipality on the code's soil gas list: it isn't optional. Your drawings need to show compliant soil gas control to get the permit.
  • Test result above the guideline: hire a C-NRPP certified professional to activate or install a system, then retest.
  • Test result well under the guideline: retest after major renovations, HVAC changes or every few years, since conditions can shift.

We've run a lot of underpinning and basement suite permits through Toronto Building and the York Region municipalities, and the projects that go smoothest are the ones where these small slab decisions are made at the drawing stage, not argued about on site with a concrete truck idling at the curb. If you're about to underpin, it's worth having PermitsHub review your foundation details before the permit goes in so the rough-in, sump detail and drainage are coordinated from the start.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

Basements

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT