Adding a Secondary Suite to a Large Bayview Hill Home in Richmond Hill

Bayview Hill houses are big enough that the basement isn't your only option for a secondary suite. A main-floor wing or the room over the garage can work too, and often makes a better unit. Each location changes the fire separation, entrance and drawing requirements in a different way. Here's how the three options compare once a Richmond Hill plan examiner gets the file.

By PermitsHub Team9 min read

Key Takeaways

  • In a Bayview Hill home a secondary suite can legally go in the basement, on the main floor or on an upper floor, provided it meets the Ontario Building Code for fire separation, egress and alarms and fits Richmond Hill's additional residential unit zoning.
  • Placing the suite above grade does not create a different type of permit, but the drawings get more involved because every wall, floor and ceiling touching the main unit becomes a rated fire separation.
  • Open two-storey foyers, galleries and curved feature staircases are the most common reason an upper-floor suite layout fails in these houses, because the open space has to be enclosed or the suite boundary redrawn around it.
  • Houses with a second staircase, two furnaces or a bonus room over the garage with its own stair are the easiest candidates for an above-grade suite.

Bayview Hill Suite Placement

A secondary suite in a Bayview Hill home can legally go in the basement, on the main floor, or on an upper floor. Richmond Hill's additional residential unit rules don't require the suite to be below grade. Whatever location you choose, the suite has to meet the Ontario Building Code for fire separation, exits, smoke and CO alarms and heating, and it has to fit the town's zoning for additional units. Moving the suite above grade doesn't change the type of permit. It changes what the drawings have to show, and it usually makes the fire separation work harder, because the suite now shares walls, floors and ceilings with the main house on more sides.

What a typical Bayview Hill house gives you to work with

Most of the houses between Bayview and Leslie went up from the late 1980s through the early 2000s, and they were built big. Three-car garages, two-storey foyers, curved feature staircases, main-floor libraries, and basements that are often already finished. Lots backing onto the valley lands frequently have a walkout. A fair number have a second, plainer staircase from the kitchen or mudroom, and a bonus room or nanny suite over the garage.

That's a very different starting point from a Toronto semi, where the basement is the only realistic option. In Bayview Hill the question isn't whether there's room for a suite. It's which part of the house can be closed off from the rest with the least demolition, and which part gives the suite its own way out.

Two features decide most of these projects. The first is staircases: a house with two of them can give one to the suite. The second is mechanical: many of these homes were built with two furnaces to heat the upper and lower floors separately. That helps a great deal, because a suite on its own heating system avoids one of the fussier code items.

Option one: the walkout basement

The basement is still the most common choice, and in a house with a walkout it's usually the simplest permit. The walkout gives you a separate entrance at grade without cutting a new stairwell into a side yard. That matters here, because even on wide lots the side yards beside these houses are often tight, and a new below-grade entrance means excavation, a retaining wall, drainage and a check against the zoning setbacks.

Ceiling height is less of a problem than in older housing stock. Many basements from this era were poured deeper than the postwar bungalows further south, but bulkheads for ductwork and steel beams can still drop below the minimum in hallways and bedrooms. Bedrooms need egress windows unless the suite has another compliant exit, and a big finished basement with small builder windows often needs one or two enlarged.

The catch with a finished basement is that someone already finished it, sometimes without a permit, with drywall that wasn't installed as a rated assembly. To show the ceiling is a proper fire separation, the examiner or inspector may need to see what's above it. That can mean opening up the ceiling you were hoping to keep.

The basement looks like the cheap option until you find out the existing ceiling can't be proven as a fire separation. Then you're tearing out a finished room to rebuild it the way the code wanted it the first time.

Option two: a main-floor wing

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Some Bayview Hill layouts have a ground-floor wing that almost works as a suite already: a library or den with a powder room, next to a side door, sometimes with a laundry room or mudroom attached. For an aging parent who shouldn't be climbing stairs, a main-floor suite is often the better unit, with full daylight, a step-free entrance and no worries about window wells.

The trade-off is that a main-floor suite has the main house above it and usually beside it, and often below it too if the basement is finished. The walls between the suite and the rest of the main floor, the ceiling under the second floor and the floor over the basement all have to be fire separations. Doors between the two units have to be rated, self-closing and properly installed. Where the wing opens onto the family room through a wide archway, that opening has to be framed in.

The kitchen is usually the hard part

A library doesn't have a gas line, a range hood exhaust route or a drain sized for a kitchen sink and dishwasher. Getting plumbing to a main-floor wing often means running lines through the finished basement ceiling, which brings you back to opening up drywall. Plan the suite kitchen against the wall closest to the existing stack wherever possible.

Option three: an upper-floor suite or the room over the garage

Upper-floor suites look easy on paper because these houses have so many bedrooms. In practice the second floor of a Bayview Hill home is where most layouts fall apart, and the reason is the foyer. A two-storey entry with a gallery hallway overlooking it means the upstairs corridor is open to the main floor. If that corridor is part of the path between the suite and the main unit, or if the suite boundary runs along it, the open space has to be enclosed or the suite has to be redrawn so it doesn't touch it.

Exits are the second problem. A suite one storey up needs a way out that doesn't depend on walking through the main unit. If the only stairs are the curved feature staircase into the foyer, you're either enclosing a showpiece staircase or adding an exterior stair, which brings zoning, setbacks and appearance into play.

The exception is the bonus room over the garage, especially one with its own back stair down to the mudroom or garage. That room is already separated from the house on one side by the garage wall and ceiling, which the code requires to be gas-tight. With its own stair to a side door, it's frequently the best above-grade suite in the house. We've drawn several of these in Bayview Hill, and the projects that went smoothly were almost always ones where the back stair and a second furnace already existed.

Rules that apply no matter where the suite goes

The location changes how hard each item is, but the checklist stays the same. A Richmond Hill plan examiner reviewing a house with a secondary suite will look for:

  • A continuous fire separation between the two units, covering walls, floors, ceilings and any openings, with rated doors where the units connect.
  • Smoke alarms in each unit that are interconnected so an alarm in one sounds in both, plus CO alarms where there are fuel-burning appliances or an attached garage.
  • An exit from the suite that doesn't pass through the other unit, or a shared exit that is itself fire separated.
  • Heating and ventilation that doesn't move smoke between units: separate systems, or a shared system with the controls and dampers the code calls for.
  • Bedroom windows that meet egress size where the code requires them.
  • Electrical work done under an ESA permit, which is separate from the building permit.

For existing houses the building code allows compliance alternatives, so some fire separation ratings can be lower than in new construction if smoke alarms are interconnected and the house meets the age conditions. Don't assume your project qualifies. The examiner decides which path applies based on the drawings, and our article on secondary suite fire separation explains the detail.

Zoning and the unit rules

Provincial changes under the More Homes Built Faster Act allow up to three residential units on most urban residential lots in Ontario, and Richmond Hill updated its additional residential unit policies to match. On a Bayview Hill lot that can mean a principal dwelling plus one or two suites, or a suite inside the house plus a detached unit in the yard. The town's zoning still regulates things like the suite's relationship to the principal dwelling, parking, and where entrances can go. Some of those rules have changed in the last few years, so check the current bylaw wording on unit size, entrance location and parking before you commit to a layout. Older suite policies often discouraged new entrances on the street-facing wall, and that kind of rule can decide whether a main-floor wing works.

Lots that back onto valley lands may fall within a TRCA regulated area. Interior work usually isn't affected, but a new exterior stair, an enlarged walkout or regrading near the slope can trigger a TRCA review alongside the building permit.

How the permit file changes when the suite is above grade

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

The application type is the same: a building permit for a house with a secondary suite. What grows is the drawing set. A basement suite usually needs a floor plan of the basement, a section through the ceiling assembly and the main floor plan where it touches the suite. An above-grade suite often needs plans for every floor the suite touches, sections through each separating assembly, details for every door and enclosed opening, and a clear exit path drawn from each suite bedroom to the outside.

The examiner comments change too. On basement files they focus on ceiling heights, window sizes and the ceiling assembly. On above-grade files they tend to ask about continuity, meaning places where the separation stops at a closet, a bulkhead, a laundry chute or a return air grille. Laundry chutes and central vacuum lines that run through both units are a classic Bayview Hill comment, because nearly every house this size has them. At PermitsHub we survey for those before drawing, since finding them at inspection means a revision and a delay.

Inspections follow the same pattern. Expect the framing and fire separation inspection to be the one that matters most, and expect it to take longer when the separation runs across three or four assemblies rather than one ceiling. Once the permit closes, Richmond Hill and York Region have their own registration and property records for second units, which is a separate step from the building permit.

Choosing the location: a quick way to decide

Start with exits, not floor area. Whichever part of the house already has its own way out (a walkout, a side door into a wing, a back stair from the garage room) is usually the right place for the suite. Next look at the mechanical layout. If one furnace already serves only that area, you've solved the heating item. Last, look at what the separation has to cross. A basement needs one rated ceiling. A main-floor wing needs walls and a ceiling. An upper-floor suite near the foyer may need the foyer itself rebuilt.

If two locations tie, the suite with fewer openings into the main house nearly always gets through review faster and costs less to build. Square footage matters less than most owners expect. Continuity matters more.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

ADU / Garden Suite Eligibility

What type of property do you have?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

ADUs

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT