Permit Rules for Adding a Second Bathroom to a Scarborough Bungalow
Yes, a second bathroom in a Scarborough bungalow or side-split almost always needs a plumbing permit, because you're adding fixtures, drains and a vent. The harder question is how your house's single stack and aging lateral shape the design, and what the Scarborough district office will check before you close the walls.
Key Takeaways
- Adding a new toilet, sink or shower where none existed requires a plumbing permit in Toronto, while swapping fixtures in their existing locations generally does not.
- Most post-war Scarborough bungalows have one main drain stack, so the location of the new bathroom is really decided by how far it sits from that stack and how it will be vented.
- A camera inspection of the original cast iron or clay lateral before design work can save you from breaking a new basement floor twice.
- Toronto Building expects underground and rough-in plumbing inspections to happen before slabs are poured and walls are closed, and skipping them is the most expensive mistake homeowners make.
Scarborough Second Bathroom Permits
Yes. If you're adding a second bathroom to a Scarborough bungalow or side-split, you need a plumbing permit from the City of Toronto, because you're installing new fixtures, new drain lines and a new vent. You'll also need a building permit if the work involves structural changes such as cutting floor joists, moving a load-bearing wall or adding a window. Replacing a toilet, vanity or tub in the exact same spot does not need a permit. The permit is reviewed and inspected through Toronto Building's Scarborough district office at the Scarborough Civic Centre.
What triggers a plumbing permit and what doesn't
The line Toronto Building draws is simple in principle: if you're changing the drainage, waste and vent system, you need a permit. If you're only swapping finishes and fixtures on existing connections, you don't. A second bathroom is new plumbing by definition, so the question is rarely whether you need a permit. It's how much of the house the permit ends up touching.
- Permit required: a new toilet, shower, tub or sink where there was no fixture before.
- Permit required: relocating an existing fixture to a new drain position, even a short distance.
- Permit required: a new vent pipe, a new connection to the stack, or changes to the building drain under the basement slab.
- Permit required: a new backwater valve, sump or sewage ejector pit.
- No plumbing permit: replacing a toilet, faucet, vanity or tub on the same rough-in.
- No plumbing permit: retiling, new drywall or new cabinets, as long as no drain or vent is moved.
Electrical is separate. A new bathroom needs a GFCI-protected circuit and an exhaust fan, and that work goes through the Electrical Safety Authority (ESA), not the City. The exhaust fan is not optional: the Ontario Building Code requires mechanical ventilation in a bathroom, and the fan has to discharge to the outside, not into the attic.
Why the single stack in a Scarborough bungalow decides where the bathroom goes
Most of the bungalows built across Wexford, Dorset Park, Clairlea, Ionview and Bendale in the 1950s and 60s were plumbed around one main stack. The kitchen sink, the one bathroom and the laundry all drain into that single vertical pipe, usually a cast iron stack that runs from the basement floor up through the roof. The house was designed for one bathroom, and the stack location tells you where a second one is easy and where it gets complicated.
A new bathroom close to the stack can often tie in with short horizontal runs and a vent connection that stays within the distances the Ontario Building Code allows. A bathroom on the far side of the house, say a new ensuite carved out of the back bedroom, may need its own vent through the roof and a long drain run that has to keep a consistent slope. In a bungalow with 2x8 joists, a 3 inch toilet drain running across the joists is where projects get into trouble.
On a Scarborough bungalow, the stack picks the bathroom location long before the homeowner does. Fight the stack and you end up cutting joists, which turns a plumbing permit into a building permit.
Main floor ensuites in bungalows
Converting a closet or part of a bedroom into an ensuite is the most common request we get for these houses. The trouble is the toilet. Its drain has to drop through the floor and run to the stack, and if that path crosses joists, the plumber is tempted to notch or bore them. The Building Code puts strict limits on how deep and where you can notch or drill a joist, and an inspector who sees a toilet drain sitting in a notched joist near midspan will fail the rough-in. If the drain can't be run without exceeding those limits, you need headers or sistered joists, and that structural change needs a building permit with drawings.
Side-splits and staggered floors
Side-splits are a different puzzle. The bedrooms usually sit half a level above the main floor, often over a garage or a lower family room, and the original bathroom is on that upper level. A second bathroom on the lower level or in the basement may be several storeys of pipe below the existing fixtures, which is fine for drainage, but the vent has to find its way back up through a house whose floors don't line up. When the new bathroom sits over the garage, the drain also has to pass through the fire separation between the garage and the living space, and penetrations there need proper firestopping.
The drain under the slab and the lateral to the street
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
A basement bathroom in a bungalow almost always means breaking the floor. The building drain runs under the slab from the stack to the foundation wall, then out to the street through the sewer lateral. A new toilet and shower have to tie into that drain, so the concrete gets cut, the trench dug, and new pipe joined to old.
This is where Scarborough houses show their age. Original building drains from this era are typically cast iron under the slab, and the laterals out to the street are often clay tile or cast iron. Clay laterals in neighbourhoods with mature silver maples and willows are prone to root intrusion and cracked joints. Cast iron under the slab can be scaled inside or rotted along the bottom. When the plumber opens the floor to tie in, they may find the existing pipe isn't in shape to connect to.
We tell every Scarborough client the same thing before drawings start: get the drain scoped with a camera. If the lateral is failing, you want to know before the bathroom is designed, not after the new floor is poured. Replacing the building drain or the private portion of the sewer connection is itself plumbing work that needs a permit, so it's far cleaner to fold it into the same application. The portion of the lateral on City property is Toronto Water's responsibility, and if the camera shows damage there, you report it to the City separately.
There's also a depth question. If the new basement fixtures sit below the level of the existing building drain, gravity won't carry the waste out and you'll need a sewage ejector pit with a pump. That changes the drawings, adds an electrical connection and gives the inspector one more thing to check.
Venting through the roof
Every new fixture needs a vent, and this is the part homeowners rarely think about until the plan examiner asks. Vents let air into the drain system so the traps don't get siphoned dry and sewer gas stays out of the house. In a bungalow, the easy answer is to connect the new fixtures to the existing stack within the permitted distances. When the new bathroom is too far away for that, the vent has to go up through the house and out the roof on its own.
For a basement bathroom, that means a pipe running from the basement, through a main floor wall or closet, into the attic and out the shingles. In a bungalow with low-slope roofs and limited attic space, routing that pipe without opening up finished main floor rooms takes some planning. Ontario does allow air admittance valves in limited situations, but they aren't a blanket substitute for a conventional vent, and examiners in Toronto often want to see why a proper vent can't be run before they accept one. Assume you'll need a real vent through the roof unless your designer confirms otherwise.
Backwater valves on basement fixtures
If you're adding fixtures in the basement, expect backwater protection to come up. The Ontario Building Code generally requires backwater valves where fixtures sit below the level of the adjoining street, which describes nearly every basement bathroom in Scarborough. Large parts of the area flooded in past major storms, and the City has pushed hard for backwater valves in older houses.
A properly installed mainline backwater valve sits in the building drain, under the slab, with an access cover so it can be cleaned. It has to be installed so it protects the basement fixtures without trapping upper floor drainage, which is why location on the drawings matters. Since you're already breaking the floor for the new bathroom, adding the valve during the same dig is the obvious time. Toronto's Basement Flooding Protection Subsidy Program has helped eligible homeowners with the cost of backwater valves, though the program's rules and eligibility change, so confirm the current requirements with the City before you rely on it, and check whether you need pre-approval or specific documents before the work starts.
What the Scarborough district office reviews and inspects
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
Toronto Building assigns your application to the district office based on the property address, so a Scarborough house is handled through the Scarborough Civic Centre office. For a plumbing only permit, the submission typically includes a plan showing the new fixtures, the drain routing, pipe sizes and vent connections. If there's structural work, you'll also need framing details and the building permit drawings that go with them. Examiners send applications back for revisions most often when the drawings don't show how the vent connects, when pipe sizes are missing, or when a backwater valve location doesn't make sense relative to the fixtures.
Once the permit is issued, inspections follow the order of construction:
- Underground plumbing inspection: the new drain and backwater valve in the trench, before the concrete goes back.
- Rough-in plumbing inspection: drains and vents in the walls and floors, tested under water or air pressure, before insulation and drywall.
- Framing inspection, if a building permit is involved: any joist reinforcement, headers or new openings.
- Final plumbing inspection: fixtures set, traps in place and everything connected.
The rough-in test is where poor workmanship shows up. Inspectors want to see the system holding a test without leaks, proper slope on horizontal runs and correct trap arms. If the walls are already closed, the inspector can ask for them to be opened.
Where second bathroom projects stall in Scarborough
Having run a lot of these applications across Scarborough, from Agincourt down to Birch Cliff, we see the same handful of problems again and again.
The first is pouring the slab before the underground inspection. The plumber is on site, the trench is open, the concrete truck is booked, and nobody wants to wait. Then the final inspection can't be passed because the inspector never saw the drain, and the options are breaking the floor again or providing a camera inspection and an engineer's letter that the City may or may not accept.
The second is the second unit question. A basement bathroom combined with a bedroom, a separate entrance and a kitchenette starts to look like an additional residential unit. Toronto permits these, but they come with fire separation, egress and other requirements that a bathroom permit doesn't cover. If you're thinking about renting the basement down the road, design the bathroom with that in mind now, and apply for the right permit from the start rather than legalizing later.
The third is drawings that don't match the house. Scarborough bungalows were often modified over the decades, with stacks rerouted, laundry moved and old fixtures capped. Drawings based on assumptions rather than a site measure end up revised mid-construction, which means a revision submission and a delay. PermitsHub measures the existing plumbing layout before we draw, then prepares the plumbing drawings and handles the submission and any examiner comments, so the permit reflects what the plumber will actually build.
None of this makes a second bathroom a difficult project. It just means the plumbing behind the walls decides more than the floor plan does. Locate the stack, scope the lateral, plan the vent and book your inspections before you pour, and the permit becomes the straightforward part. If you want a second set of eyes on whether your layout works with your existing stack, a free PermitsHub review of your house will tell you before you commit to a design.