New Home Construction Permit
PermitsHub manages your new home construction permit application, drawings, and approvals in Toronto and the GTA.

Scope of service.
Building a new home in Toronto or the GTA requires a building permit before any construction begins. This permit confirms your project meets the Ontario Building Code, zoning bylaws, site plan requirements, and municipal standards. The application process involves coordinating architectural drawings, structural engineering, energy compliance (SB-10), servicing plans, and often Committee of Adjustment approvals if variances are needed. New home construction permits are among the most complex residential applications. They require detailed submissions covering foundation design, framing, mechanical systems, plumbing, electrical, insulation, and fire safety. Municipal review times vary significantly depending on project scope and location. PermitsHub coordinates all technical consultants, prepares complete submission packages, and manages the review process so you can focus on your build timeline and budget.
- Single-family detached homes, semi-detached homes, and townhouses
- Architectural drawings stamped by an Ontario architect (OAA)
- Structural engineering drawings and calculations sealed by a P.Eng
- Energy compliance reports (SB-10) and building envelope details
- Servicing plans including grading, drainage, water, and sewer connections
- Zoning review and Minor Variance applications if required
Who needs this
You need this permit if you are constructing a new residential dwelling on a vacant lot or after demolishing an existing structure. This applies to custom builds, spec homes, and infill projects in Toronto, Mississauga, Vaughan, Markham, and other GTA municipalities.
Included as standard
- City-compliant permit drawings
- Zoning & by-law review
- Application submission
- Revision management
Four steps to an approved permit.
01
Consultation
Free scoping call to review your project, lot and goals. No pressure, no fee.
02
Drawings & Zoning
City-compliant permit drawings and full zoning compliance review.
03
Submission
Application filed with the City. We manage every revision round to closure.
04
Permit Approved
Stamped permit in hand. Ready to build with confidence.
Express City fast-lane available for eligible small residential projects - timeline depends on project type and City queue
New Home Construction Permit - your questions
Get started
Ready to start your new home construction permit?
Free, no-pressure quote within one business day.
● Flat-rate quotes - no surprise fees
● Revisions included until approval
● Most enquiries responded to same day