Bathroom Renovation Permit
PermitsHub prepares and submits your bathroom renovation permit application to Toronto Building for plumbing, electrical, and structural work.

Scope of service.
Bathroom renovations in Toronto require a building permit when you're moving or adding plumbing fixtures, relocating walls, upgrading electrical systems, or making structural changes. The City of Toronto requires permits to ensure work meets the Ontario Building Code, particularly for waterproofing, ventilation, and safe electrical installations in wet areas. PermitsHub handles the entire permit process for your bathroom renovation. We prepare drawings showing existing and proposed layouts, coordinate with your contractor to document plumbing and electrical changes, submit applications to Toronto Building, and respond to any review comments. Most bathroom renovation permits involve plumbing and electrical components, which require licensed trades to pull separate permits after the building permit is issued.
- Moving or adding sinks, toilets, showers, or bathtubs
- Relocating or removing walls to expand bathroom space
- Installing new electrical outlets, lighting, or exhaust fans
- Upgrading plumbing supply lines or drain waste vent systems
- Structural changes including floor reinforcement or joist modifications
- Waterproofing details for shower enclosures and wet areas
Who needs this
You need this permit if you're moving plumbing fixtures, removing or adding walls, upgrading electrical systems beyond simple replacements, or making any structural changes to your bathroom. Cosmetic updates like replacing tiles, vanities, or fixtures in the same locations typically don't require a permit.
Included as standard
- City-compliant permit drawings
- Zoning & by-law review
- Application submission
- Revision management
Four steps to an approved permit.
01
Consultation
Free scoping call to review your project, lot and goals. No pressure, no fee.
02
Drawings & Zoning
City-compliant permit drawings and full zoning compliance review.
03
Submission
Application filed with the City. We manage every revision round to closure.
04
Permit Approved
Stamped permit in hand. Ready to build with confidence.
Express City fast-lane available for eligible small residential projects - timeline depends on project type and City queue
Bathroom Renovation Permit - your questions
You might also need.
Get started
Ready to start your bathroom renovation permit?
Free, no-pressure quote within one business day.
● Flat-rate quotes - no surprise fees
● Revisions included until approval
● Most enquiries responded to same day