What Toronto's Ravine Bylaw Stops You Building in Your Own Backyard

Toronto's ravine bylaw doesn't ban decks, sheds or pools. It bans the things those projects quietly involve: digging in tree roots, changing your grade and bringing in fill. If your lot is in the mapped protection area, even a project that needs no building permit can need an Urban Forestry permit first.

By PermitsHub Team10 min read

Key Takeaways

  • Toronto Municipal Code Chapter 658 prohibits injuring or destroying trees, altering grade and placing or dumping fill anywhere in the mapped ravine protection area unless you have a permit from Urban Forestry.
  • The bylaw applies whether or not TRCA regulates your lot, and the protection line often runs across flat tableland well back from the slope.
  • Decks, sheds, pools, patios and retaining walls trigger the bylaw because of their footings, excavation, base material and grade changes, even when the structure is too small to need a building permit.
  • Building without the ravine permit can lead to stop work orders, restoration orders and charges, so check the City's map before you hire anyone or order materials.

Ravine Lots, Backyard Limits

Toronto's Ravine and Natural Feature Protection bylaw (Municipal Code Chapter 658) doesn't name decks, sheds or pools. It prohibits three activities inside the mapped protection area: injuring or destroying trees, changing the grade of the land, and placing or dumping fill. You can't do any of them without a permit from Urban Forestry. Most backyard projects involve at least one of the three, so on a ravine lot you can need that permit even when the project is too small for a building permit.

The bylaw catches people out because they think the question is whether they need a building permit. On a ravine lot that's the second question. The first is whether the work touches a root zone, moves soil or brings soil in. If it does, Urban Forestry needs to see it before anyone picks up a shovel.

The Three Things Chapter 658 Actually Prohibits

Every restriction under the bylaw comes back to one of three activities. Once you see your project in those terms, it gets much easier to predict what the City will say.

  • Injuring or destroying a tree. Removal counts, and so does damage: cutting roots during excavation, compacting soil over the root zone with machinery or stockpiled material, or burying the base of the trunk under new soil.
  • Altering grade. Cutting into a slope, levelling a yard, building up a low spot or terracing a hill all change the grade, whatever the reason.
  • Placing or dumping fill. This covers topsoil brought in for raised beds or lawn levelling, gravel and screenings under patios and sheds, and the habit of tipping yard waste or construction debris over the top of the bank.

The bylaw is broader than the general private tree bylaw that applies elsewhere in the city. Outside the ravine area, private tree protection is tied to trunk size. Inside the ravine area the protection reaches further, and the City cares as much about the ground as the trees. Confirm the current thresholds and exemptions with Urban Forestry for your specific trees, because a small tree you assumed was exempt may not be.

Why Your Lot Can Be Regulated Even If You Can't See the Ravine

The protection area is a mapped boundary on the City's Ravine and Natural Feature Protection map, and it doesn't follow the top of the slope. It often extends onto the flat tableland behind it. We regularly see lots in Hoggs Hollow, York Mills, Humber Valley Village, Leaside near Burke Brook and the Scarborough streets backing onto Highland Creek where the line cuts across the middle of the backyard, nowhere near anything that looks like a ravine. In older parts of Rosedale and Moore Park, whole rear yards sit inside it.

Some natural features that aren't classic valleys are mapped too. A lot with no visible slope can still be inside the area because of a woodland remnant or a small creek that was partly buried decades ago. The only reliable test is to pull up your address on the City's map and look at exactly where the line falls against your yard and your proposed work.

TRCA Is a Separate Test

Homeowners often assume the ravine bylaw and TRCA are the same thing. They aren't. The Toronto and Region Conservation Authority regulates development in hazard areas (valleys, floodplains, shorelines) under the Conservation Authorities Act and its regulation. Chapter 658 is a City bylaw enforced by Urban Forestry. The mapped areas overlap a lot, but they're drawn for different reasons and they don't match line for line. You can be inside the City's ravine area and outside TRCA's regulated area, or the reverse, or inside both. If you're inside both, you need both approvals, and neither one substitutes for the other.

The ravine line isn't drawn at the edge of the slope. Assume it's in your yard until the City's map tells you otherwise.

Decks, Sheds, Pools and Walls: Where Each One Trips the Bylaw

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

The same project can be routine on a regular lot and a permit file on a ravine lot. Here's where each common backyard project usually runs into the bylaw.

Decks

A low deck close to grade may not need a building permit, but its footings still go into the ground. Every helical pile or concrete pier dug within a tree's root zone is a potential injury, and on ravine lots the mature trees are usually right where people want the deck, at the back where the view opens up. Urban Forestry will want footing locations shown against the tree protection zones. Sometimes they'll ask you to shift piles, switch to screw piles to reduce root damage, or cantilever around a major root. Elevated decks on a slope also tend to come with regrading underneath, which brings in the grade rule as well.

Sheds

Small sheds below the building permit size limit are the classic surprise. The shed isn't the problem. The base is. A gravel pad means excavating and placing fill, and a concrete slab means both plus compaction. Put that pad under the canopy of a big oak or maple and you have a grade change and fill placement in a root zone. An elevated shed on blocks or small piles, kept outside the tree protection zone, is usually the easier conversation.

Pools

An inground pool on a ravine lot is the hardest backyard project to get approved. It's a large excavation, it creates a lot of surplus soil, it usually needs regrading around the deck and coping, and the equipment access route often crosses root zones. Expect Urban Forestry to look closely at where the excavated material goes (spreading it around the yard is fill), how the excavator gets in, and whether any trees come out. You'll still need Toronto's separate pool enclosure permit for the fence, and if TRCA regulates the lot, their review of slope stability and drainage on top of that.

Retaining Walls and Terracing

Retaining walls are grade changes by definition: you cut on one side and fill on the other. On ravine lots they're often proposed to make a sloped yard usable, which is exactly what the bylaw is designed to scrutinize. Taller walls also bring in engineering requirements and, near a slope, often a geotechnical opinion. Replacing a failing wall in the same footprint is generally an easier file than building a new one, but it's still grading and still needs a permit.

Patios, Fences and Landscaping

Interlock patios need a base of excavated soil replaced with granular, which is both a grade change and fill. Fence posts dug through a root zone can be a tree injury. Raised garden beds filled with imported soil, levelling a lumpy lawn with a few loads of triple mix, or building up a corner to fix drainage all count as fill placement. Homeowners don't think of these as construction, but the bylaw doesn't care what you call it.

What the Urban Forestry Ravine Permit Application Involves

The application is handled by Urban Forestry's ravine and natural feature protection staff, and it's mostly a technical drawing exercise. The City wants to see exactly what you're doing to the ground and to every tree near the work.

  • A site plan showing property lines, the ravine protection boundary, existing structures and the proposed work, drawn to scale.
  • An arborist report from a certified arborist, inventorying trees on and near the work area (including neighbours' and City trees), with tree protection zones and an assessment of the impact.
  • A tree protection plan showing hoarding locations, access routes and material storage areas kept out of root zones.
  • Existing and proposed grades where any grading or fill is involved, and on sloped lots, sometimes a geotechnical or slope stability report.
  • A replanting or restoration plan where trees are being removed or the City requires compensation planting.

Expect a permit fee and, where trees are affected, a financial security or guarantee held against the protection measures and any required replanting. The amounts change, so confirm them with Urban Forestry when you apply. Tree protection hoarding usually has to be installed and accepted before work starts. Examiners often come back on footing locations that weren't dimensioned against the protection zones, access routes that weren't shown, and grading notes that said 'minor' instead of giving actual elevations. Vague drawings are the most common reason a simple deck file turns into three rounds of comments.

PermitsHub prepares the site plan, grading information and construction drawings for these files and coordinates them with the arborist report so the footing and hoarding locations match on every sheet. Mismatched sheets are a common reason for revision requests.

How the Ravine Permit Fits With Your Building Permit and TRCA

On a bigger project, say a rear addition with a new deck or a garden suite on a ravine lot, you may be running three approvals at once. The order matters.

Toronto Building asks about trees as part of the building permit application, and on a ravine lot the file gets routed to Urban Forestry. In practice, your building permit won't be issued until the tree and ravine side is cleared. If TRCA regulates the lot, their permit or clearance usually has to be in hand too. TRCA comments on things like the setback from the top of the slope, and that can move your footprint. Get TRCA's position early, because a footprint change after Urban Forestry has reviewed your tree plan means revising both.

For projects that need no building permit at all (the small shed, the low deck, the patio, the regrading), the ravine permit may be the only approval. That's exactly why it gets skipped. No examiner flags it, and the first person who notices is often a neighbour or a City inspector walking the ravine edge.

What Happens When People Build First and Ask Later

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Ravine lots get watched. Neighbours on ravine streets tend to be protective of the slope behind them, and grading or tree work visible from the trail or the next yard draws complaints fast. When Urban Forestry investigates, the usual tools are a stop work order, an order to restore the grade or replant, and charges under the bylaw. The fines are set out in the Municipal Code and through the Provincial Offences Act. They can be significant and are assessed per offence, so confirm current figures with the City rather than relying on what a contractor remembers.

Restoration is usually the expensive part. An order to remove fill, rebuild a natural grade and replant with native stock can cost meaningfully more than the original project. The work can also get tangled up in a later sale, because a buyer's lawyer may ask about unpermitted work on a ravine lot. In our work on ravine properties across North York and the old City of Toronto, the most common violations we're brought in to sort out are a shed pad poured under a big tree, a load of fill dumped to level the back third of the yard, and years of yard waste tipped over the bank. Each one started as something the owner didn't think of as construction.

A Practical Order of Operations Before You Build on a Ravine Lot

  • Look up your address on the City's Ravine and Natural Feature Protection map and note exactly where the boundary falls against your proposed work.
  • Check TRCA's regulated area mapping separately and assume you may need both approvals.
  • Get a certified arborist to locate the trees and root zones near the work, including neighbours' trees whose roots cross the property line.
  • Design the project around the tree protection zones (pile foundations, elevated structures, a shifted footprint) before drawings go to the City.
  • Plan where excavated soil goes and how equipment gets in, because spreading surplus soil on site counts as fill.
  • Don't book a contractor start date until the ravine permit, and any building permit or TRCA approval, is actually issued.

None of this means you can't use your backyard. Ravine lots get decks, garden suites, additions and even pools approved regularly. They get approved because the design was shaped around the trees and the grade from the start, not adjusted after an examiner pointed out the conflict.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

Zoning & Bylaws

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT