What Counts in Toronto Floor Space Index? Basements, Garages, Attics

Under Toronto's Zoning By-law 569-2013, floor space index is your house's gross floor area divided by your lot area. Some floor area counts toward that number and some doesn't. A true basement usually stays out. Finished attics and stairs usually count. Garages depend on where they sit. Getting these rules right often decides whether your addition is approved as-of-right or goes to the Committee of Adjustment.

By PermitsHub Team9 min read

Key Takeaways

  • Floor space index in Toronto is gross floor area divided by lot area, and the maximum for most residential lots is the number after the letter d in the zone label, for example d0.6.
  • A basement stays out of the count only while it still meets the by-law's definition of a basement. Raising the ceiling relative to established grade can turn it into the first storey, and then it counts.
  • Finished attic rooms, interior stairs on each level and most at-grade garage space should be assumed to count until the specific clause for your zone has been checked.
  • Getting the floor area math wrong at the design stage is one of the most common reasons an addition that looked as-of-right gets a zoning notice and ends up at the Committee of Adjustment.

Floor Space Index Decoded

Under Toronto Zoning By-law 569-2013, floor space index (FSI) is the gross floor area of the buildings on your lot divided by the area of the lot. Gross floor area is measured from the outside face of the main walls on every floor level, above and below ground. The by-law then removes certain spaces from that total. For houses, the exclusions that matter most are true basements and below-grade parking. Finished attic rooms, interior stairs on each level, and most at-grade living space all count. Whether a space counts often depends on a few centimetres of grade or one clause in your zone, and that is usually what decides whether an addition is as-of-right or needs a minor variance.

Reading the FSI Limit Off Your Zone Label

Start with your zone label on the City's interactive zoning map. A typical detached-house label looks like RD (f12.0; a370; d0.6). The f is minimum frontage, the a is minimum lot area, and the d is the maximum floor space index. On a 370 square metre lot with d0.6, your house can have up to 222 square metres of gross floor area. Gross floor area is measured to the outside of the walls, so the number is larger than the interior area you'd tally room by room.

Not every label has a d. Some RD zones and many semi-detached and townhouse zones don't cap density in the label. In those zones, floor area is controlled by lot coverage, setbacks, height and building depth instead. Other lots fall under site-specific exceptions or a former municipal by-law that the City hasn't fully replaced. If your label shows an exception number, read the exception before you do any other math. It can override the general rules in either direction.

FSI and lot coverage are two separate limits. Lot coverage controls the building's footprint. FSI controls total floor area across all levels. A bungalow can sit at its coverage limit with plenty of FSI left, which is why second storeys are so common in postwar neighbourhoods. A tall, narrow house in the old city can be the reverse: lots of yard, but no floor area left.

Basements: Excluded Until the Grade Says Otherwise

In the residential zones most homeowners deal with, a basement doesn't count toward gross floor area. This is the single biggest reason people think they have more room to build than they do, or less. The trap is the definition. Under 569-2013, a basement is any storey below the first storey. The first storey is the storey whose floor is closest to established grade and whose ceiling sits more than a set height above it, currently 1.8 metres. Confirm that figure against the by-law version that applies to your lot.

Established grade isn't the dirt beside your foundation. For most lots, it's the average ground elevation at the two points where the side lot lines meet the front lot line. On a lot that drops toward the back, or sits above the street, your basement can be well underground at the rear and still count as the first storey because of what's happening at the front property line.

The most expensive surprise in Toronto zoning is a basement that quietly becomes the first storey. Suddenly every square metre of it counts, and the house above it is a storey taller than the drawings claimed.

Where we see basements flip

  • Underpinning to add headroom: lowering the floor is usually safe, but raising the main floor to get the same headroom can push the lower level's ceiling over the threshold.
  • Raised bungalows and backsplits in Etobicoke, North York and Scarborough, where the lower level already sits half out of the ground before any work is done.
  • Walkout basements on ravine and sloping lots, where the rear looks like a full storey even if the front calculation keeps it a basement.
  • Rebuilds where the new main floor is set higher than the old one to clear a storm sewer connection or a deep footing.

Side-splits deserve their own warning. A split-level house has floors at three or four different elevations. The examiner has to decide which one is the first storey, and therefore which levels count as basement. We've seen two reasonable readings of the same survey produce floor area totals that differ by a full room. If you own a split-level in Scarborough or Don Mills, settle this question with grade elevations on a real survey before you commit to a design.

Garages: Below Grade, Attached, Detached

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Parking below established grade is excluded from gross floor area. That's why the integral garages under some infill houses, reached by a reverse-slope driveway, don't eat into FSI. The trade-off is that reverse-slope driveways bring their own scrutiny from Transportation Services and Toronto Water over drainage and flooding. A garage you save on paper can cost you time elsewhere.

At-grade attached and integral garages are where we see the most back-and-forth with examiners. The treatment depends on the exact wording for your zone and on whether the space is used only for parking. If a garage becomes a mudroom or workshop, or doubles as a laundry or storage area, any exclusion you were relying on is in doubt. Assume an at-grade garage counts until the specific clause for your zone says otherwise. Then have that clause cited in the zoning review, not paraphrased.

Detached garages and sheds are ancillary buildings. They have their own height, coverage and setback rules in 569-2013. How they interact with the main house's floor area depends on your zone, so check the clause rather than assume. Garden suites and laneway suites have their own sets of provisions, and recent changes were written so a suite doesn't have to be squeezed out of the main house's density. Those rules have been amended more than once, so confirm the current version before you plan around them.

Attics, Stairs and Double-Height Rooms

An unfinished attic with no floor, reached only through a hatch, generally isn't floor area. Once you lay a floor, frame walls and add a fixed stair, you've created a storey or a part of one, and it counts. Dormers make this worse, because they create the headroom that turns attic space into usable rooms. Homeowners in Leaside and East York often assume a dormered third floor is free space because the roof was already there. In a d-limited zone it isn't, and it can also trip the storey count and main wall height limits.

Stairs are a common misunderstanding. People read that stairwells are excluded and assume their own staircase drops out of the count. In 569-2013, the stairwell exclusions apply to buildings like apartments, not houses. In a detached or semi-detached house, the stair area counts on each floor level it passes through. A switchback stair serving three floors can account for more floor area than a powder room on every level.

Double-height spaces work the other way. Gross floor area counts floor, so the open-to-below area above a two-storey foyer or great room isn't counted on the upper level. Designers use this on purpose: a dramatic space that costs no FSI. Make sure the drawings label the void clearly. If a future owner floors it over, they've added area the permit never approved.

Where FSI Decides an Addition

Rear additions and second storeys hit FSI in different ways. A one-storey rear addition adds floor area roughly equal to its footprint. A second storey over an existing bungalow adds the whole floor plate in one move, and a bungalow that was well under its limit can blow past it. The second storey usually wins on coverage and yard space. The rear addition usually wins on FSI. In a d-limited zone, that comparison is often the whole design decision.

Before drawing anything, we run a floor area schedule: every level, measured to the outside of the walls, with each exclusion listed and justified. It's the same table the examiner will build, and it's where you find out whether you need a variance. When PermitsHub prepares permit drawings, this schedule goes on the zoning statistics sheet with the grade elevations that support any basement exclusion. That's the evidence the examiner looks for first.

If the numbers don't work, you have three choices. Shrink the design. Shift area into spaces that are excluded, which usually means a deeper basement rather than a taller main floor. Or apply for a minor variance under section 45 of the Planning Act. The Committee of Adjustment sees FSI variances constantly, and a modest increase that fits the street's existing density often has a reasonable path. Expect the hearing to add months, and expect neighbours to read your FSI request as a statement about the house's bulk, even when the extra area is mostly underground.

Older By-laws and Site-Specific Exceptions

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Some lots are still governed partly by a former municipal by-law, such as North York's By-law 7625 or the old Etobicoke and Scarborough by-laws. These by-laws define gross floor area and its exclusions differently from 569-2013. A basement or garage that's excluded under one can count under the other. When both apply, the examiner checks the project against each, and the stricter result controls.

Site-specific exceptions and Official Plan Amendments add another layer. A subdivision built under a special agreement may have its own floor area cap, sometimes stated as a fixed number of square metres rather than an index. That number may count the basement where 569-2013 wouldn't. We've worked through these in North York and Etobicoke many times. The pattern is the same each time: the zone label looks generous, and the exception text takes it back.

Confirming the Count Before You Spend on Design

  • Order or dig up a current survey with topographic elevations at the front lot line, so established grade is calculated from real numbers.
  • Pull the full zone label and any exception text from the City's zoning map, and check whether a former municipal by-law still applies to your lot.
  • Build a level-by-level floor area schedule that lists each exclusion and the clause it relies on.
  • Consider Toronto Building's Preliminary Project Review if the design depends on a borderline basement or garage exclusion, so you get the City's reading before full drawings.
  • Check the existing house too, since a past finished attic or enclosed porch may already have used up FSI you were counting on.

Most FSI problems aren't really design problems. They're measurement problems that nobody caught until the zoning notice came back. If you sort out grade, the definitions and the exclusions first, the design decisions that follow are usually simple.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

Zoning & Bylaws

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT