Shed Permits in Wexford and Maryvale (M1R, M1P): Size and Setback Rules

Most backyard sheds in Wexford and Maryvale never need a building permit, but every one of them still has to meet Toronto's zoning rules for ancillary buildings. On bungalows with a legal basement unit there's a second trap: a shed sitting on the exterior route to the suite's entrance can put the whole unit out of compliance. Here's how to place it right the first time.

By PermitsHub Team9 min read

Key Takeaways

  • Under the Ontario Building Code exemption, a detached one-storey shed of 15 square metres or less in building area with no plumbing generally doesn't need a building permit, but you should confirm the current threshold with Toronto Building before ordering a kit.
  • Permit-exempt sheds still have to follow zoning: Toronto's Zoning By-law 569-2013 (or a former Scarborough bylaw on some lots) controls where an ancillary building sits, how close it gets to lot lines, how tall it is and how it counts toward lot coverage.
  • If your house has a legal basement unit with a side or rear entrance, the exterior route from that door to the street has to stay clear, and a shed placed on that route can create a fire safety and building compliance problem.
  • Adding electrical, plumbing or a sleeping area changes what the structure is, so a simple storage shed can quickly turn into something that needs ESA approval, a building permit or both.

Sheds, Setbacks, Side Doors

A backyard shed in Wexford or Maryvale generally needs a building permit only if its building area is more than 15 square metres, or if it has plumbing, more than one storey, or is attached to the house. Smaller detached sheds are exempt from the permit under the Ontario Building Code, but they are not exempt from zoning. Every shed, permit or not, still has to meet Toronto's rules for ancillary buildings: where it sits on the lot, how far it is from the lot lines, how tall it is, and how it adds to lot coverage. On houses with a legal basement unit, it also can't block the exterior path to that unit's entrance.

That last point is the one that catches people in M1R and M1P, and it's specific to how this part of Scarborough has changed over the last decade. Let's go through it in the order the problems actually show up.

The 15 square metre line, and what quietly pushes a shed over it

The exemption is measured as building area, which means the outside footprint of the walls, not the interior floor space printed on the kit box. A shed advertised as 10 by 16 feet is roughly 14.9 square metres, which sounds safe until you notice the manufacturer measured the floor and the walls sit outside it. Add a covered porch or a deep roof overhang supported on posts and an examiner may count that too. We see homeowners who thought they were comfortably under the line and were actually over it once the real footprint was drawn.

The province has periodically looked at changing the size threshold for accessory buildings, and the exemption comes with conditions about separation from other buildings and use. Rules shift. Before you order, check the current exemption with Toronto Building or have someone confirm it against your exact plan.

Size isn't the only trigger. These change the answer even for a small shed:

  • Plumbing of any kind, including a utility sink or a washroom, brings the structure under a building permit.
  • A loft or second level that makes it more than one storey.
  • Attaching it to the house, a deck or a garage, which makes it part of that building rather than a detached shed.
  • Electrical wiring, which needs an ESA permit and inspection regardless of the shed's size.
  • Using it as a home office, studio or sleeping space, which shifts it away from storage and toward habitable space with different code requirements.

If the plan is really a backyard office with insulation, power and a heater, treat it as a small building project from day one. Retrofitting a permit after the slab is poured and the walls are closed is slow and often means opening things up for inspection.

Zoning rules that apply to every shed, permit or not

No building permit means nobody reviews your shed before it goes up. It doesn't mean the zoning bylaw stops applying. If a neighbour complains or you later apply for a permit on something else, the shed gets measured against the bylaw like any other structure.

Most of Wexford and Maryvale is covered by citywide Zoning By-law 569-2013, which treats a shed as an ancillary building. Some properties are still governed by a former Scarborough community bylaw, or by both while appeals were sorted out, so the first step is confirming which bylaw actually applies to your lot. The City's interactive zoning map is the starting point, and the zone label on your property tells you which section to read.

What the ancillary building rules control

  • Location: ancillary buildings are generally expected in the rear yard, not the front yard and usually not in the side yard beside the house.
  • Setbacks from the side and rear lot lines, which are tighter or looser depending on the shed's height and whether the wall facing the line has windows or doors.
  • Height, measured from the ground to the highest point of the roof. Gambrel and barn-style kits with tall peaks are the usual offenders.
  • Lot coverage, because the shed's footprint is added to the house, attached garage and other covered structures when coverage limits apply to your lot.
  • Separation from the house and other buildings, which matters for both zoning and fire spread.

We're deliberately not quoting exact setback and height numbers here, because they depend on your zone, on which bylaw applies and on details like eaves and wall openings. Pull the ancillary building section for your zone, or get a zoning review on your actual survey. Guessing based on what a neighbour did doesn't help, because their shed may predate the current bylaw or may simply be non-compliant.

A permit exemption only skips the review. It doesn't skip the rules, and a shed that breaks them becomes your problem the day someone measures it.

The basement suite problem nobody plans for

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Walk the streets between Victoria Park and Warden and you'll see the change: side doors cut into 1950s and 1960s brick bungalows, new walkout stairs at the back, a second mailbox by the front door. A lot of these houses now have legal secondary suites in the basement, and many of those suites are entered from a side or rear door rather than through the main house.

When that suite was approved, the exterior route from its entrance to the street was part of the picture. Under the Ontario Building Code and the Ontario Fire Code requirements for houses with two units, the suite's exit has to lead outside to an open route to the street, which is how tenants get out and how firefighters get in. On a typical Wexford lot that route runs along the side yard, usually the side opposite the driveway or alongside it.

Now picture the owner, a year later, wanting somewhere to put the lawnmower and winter tires. The narrow strip beside the house looks like dead space, so a slim shed or storage locker goes there. Or the shed goes in the rear yard right where the walkway from the back entrance turns toward the side yard. Either way, the tenant's way out now runs around or through an obstruction.

How this turns into a compliance issue

A blocked or narrowed exit route can come up during a fire inspection, a tenant complaint, an insurance inspection or a future permit application for something unrelated. At that point it isn't a shed question anymore. It's a question about whether the suite still meets the conditions it was approved under. The fix is moving the shed, which is annoying but simple. The bigger risk is an emergency where a tenant in a dark basement hits a dead end.

If you're planning a side entrance and a shed at the same time, lay out both on the survey together. Gates also count: a locked gate across the side yard or a gate that swings into the path can be just as much a problem as the shed itself.

Where Wexford and Maryvale lots get tight

The housing stock here is mostly postwar bungalows, side-splits and back-splits on lots that look generous from the street but have quirks once you get into the backyard. From our files in M1R and M1P, these are the patterns that keep coming up.

  • Existing additions: many houses already have a rear addition, sunroom or enlarged garage, so lot coverage room for a shed may be smaller than you'd expect, or already used up.
  • Corner lots, especially along the curving streets near Pharmacy and Lawrence, where the side facing the street is treated more like a front yard and sheds can't go where owners assume.
  • Mature trees: large maples and spruces are common, and digging footings or a slab inside a protected tree's root zone can require a permit under Toronto's private tree bylaw.
  • Rear easements and utility lines, which sometimes run along the back of lots and restrict what you can build over them.
  • Drainage: a shed roof that sheds water onto the neighbour's yard is a classic source of complaints even when the setback is technically fine.

If your lot is already over the coverage limit because of an older addition, that existing condition may be legal non-conforming, but adding a new structure on top of it is a different matter and can push you into a minor variance at the Committee of Adjustment. For a shed, it's almost always quicker to resize or relocate than to apply for a variance.

What happens if a shed gets reported

Most shed enforcement in Scarborough starts with a neighbour calling 311. Toronto's Municipal Licensing and Standards or Toronto Building may come out, measure, and check the structure against zoning and the permit requirements. If it's too big and has no permit, you'll be told to get one or remove it. If it breaks zoning, the options are bringing it into compliance, applying for a variance, or taking it down.

Enforcement steps, fees and timelines vary by situation, so confirm with the City if you get a notice. In practice, the cheaper move is nearly always correcting the shed early: shortening the roof, shifting it away from the lot line, or downsizing it. Where a shed ties into a legal basement suite issue, deal with that quickly, because it affects your tenant's safety and your standing on any future permit.

A practical sequence before you buy the kit

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

  • Find your survey and confirm which zoning bylaw applies to your property.
  • Measure the shed's real outside footprint, including walls, posts and any covered area, and compare it with the permit exemption.
  • Read the ancillary building rules for your zone and mark the allowable area on the survey.
  • Trace the exterior route from every basement suite entrance to the street and keep the shed, gates and storage completely off it.
  • Check for trees, easements and drainage before choosing the foundation.
  • Decide now whether you'll add power, insulation or plumbing, and plan permits accordingly.

If the shed is bigger than the exemption or part of a larger project like a side entrance or basement unit, PermitsHub can prepare the site plan and drawings, run the zoning check against your survey and handle the submission and any examiner revisions. For a simple storage shed, a quick zoning look before you build is usually enough to avoid moving it later.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

By Area

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT