By Area
Turning a Rexdale or Thistletown M9V Bungalow Into a Fourplex
Most 1960s bungalows in Rexdale and Thistletown can legally reach four units under Toronto's multiplex rules. The best route usually combines the basement apartment that's already there, one more unit in or on the house, and a garden suite in that wide backyard. Here's how the permit actually comes together, and where it stalls.
Key Takeaways
- Toronto's multiplex zoning permits up to four units in a house in residential zones, so a typical M9V or M9W bungalow can become a fourplex without a rezoning, provided it meets height, depth and coverage limits or gets minor variances.
- The most practical route on a wide Rexdale lot is often three units in the house plus a garden suite. It avoids squeezing four cramped units into a single-storey footprint.
- An existing informal basement apartment cannot be grandfathered into a fourplex. Once a house has more than two units, the basement is reviewed as a new dwelling unit under the Ontario Building Code, not under the Fire Code retrofit rules for two-unit houses.
- Lots backing onto the Humber West Branch or its ravines need a separate TRCA check, and sometimes a TRCA permit, before Toronto Building will issue the building permit.
Rexdale Bungalow, Four Units
Yes. A typical Rexdale or Thistletown bungalow in M9V or M9W can usually become four units under Toronto's multiplex rules, which allow up to four dwelling units in a house in residential zones without a rezoning. On these lots the most workable route is often to legalize the existing basement apartment, add a third unit in or on the house, and build a garden suite in the backyard. The permit treats the house as a new multiplex. That means full drawings, rated fire separations between every unit, a zoning review, and a TRCA check if your lot sits near the Humber West Branch.
What a Rexdale bungalow lot actually gives you to work with
The housing stock north of the 401 between Islington and Highway 27 was mostly built in the late 1950s and 1960s. Streets off Albion Road, Kipling and Finch Avenue West are lined with brick bungalows, side splits and backsplits on lots that are wider than what you find in older Toronto neighbourhoods. Many have a carport or a single garage at the side and a deep backyard. A good share already have a side door leading to a basement that someone rented out years ago.
That combination is why these lots suit a fourplex better than a narrow East York or west-end semi does. The width gives you room for a separate entrance path along the side. The depth often gives you room for a garden suite that clears the required separation from the main house. The basement is usually full height or close to it, because these houses weren't built with crawlspaces.
The limiting factor is the main house itself. A bungalow has one storey above grade and a footprint that rarely exceeds what one comfortable family unit needs. Cutting that into four units without adding space produces apartments that are hard to rent and harder to get through plan review.
Three ways to get to four units on an M9V or M9W lot
Before anyone draws a line, decide which layout you're pursuing. It drives the structural scope, the zoning review and the budget more than any finish choice will.
Option one: four units inside the existing house
Split the main floor into two units and the basement into two units. This keeps everything under one roof and avoids a garden suite permit. On a bungalow, though, each unit ends up small. Two units have to share a basement that's broken up by a furnace room, a load-bearing beam line and often a cold cellar under the front porch. It works on the larger bungalows and on backsplits, where the four levels naturally divide. On a compact bungalow it usually doesn't.
Option two: add a second storey or a rear addition
Building up gives you a whole new floor for one or two units. Toronto's multiplex rules allow height that a single-storey bungalow is nowhere near using. The catch is that the existing foundation and walls were sized for a single storey. You need an engineer to confirm the footings can carry the load, and sometimes that means underpinning. A rear addition is simpler structurally, but it eats into the backyard you might otherwise use for a garden suite.
Option three: three units in the house plus a garden suite
This is the route we recommend most often on Rexdale lots. The basement becomes one unit, the main floor becomes one unit, and a third unit comes from a modest addition or from splitting a larger main floor. The fourth unit is a detached garden suite in the rear yard. Each unit stays livable, the house work stays manageable, and you use the lot depth that these neighbourhoods were built with. Whether a garden suite can sit on top of four units in the house is a zoning question for your specific lot, and it should be confirmed during the zoning review rather than assumed.
On a Rexdale bungalow the backyard is usually worth more as a fourth unit than the main floor is cut in half.
Bringing the existing basement apartment into the permit
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
Owners often assume the basement is already done because a tenant has lived there for ten years. For a fourplex it isn't. Ontario's Fire Code retrofit provisions for two-unit houses only cover houses with two units. Once you go past two, the basement gets reviewed as a new dwelling unit under the Ontario Building Code, with the same standards as the units you're building from scratch.
When we open up these basements, the same items come back on plan review and at inspection again and again:
- Bedroom windows that are too small for egress. Each bedroom typically needs a window with at least 0.35 square metres of unobstructed opening and no dimension under 380 millimetres, plus a proper window well if it sits below grade.
- Ceiling heights that drop under ducts and the main beam. These spots often need ductwork rerouted or a lower floor, which can lead to underpinning.
- Shared forced-air heating with the upstairs unit. Shared ductwork has to be separated or protected so smoke can't travel between units.
- Drywall ceilings that aren't part of a rated fire separation, or that have unsealed penetrations from old plumbing and wiring.
- Missing backwater valve on the sanitary line, which Toronto expects on new basement units.
- Electrical work done without ESA permits, which will need an ESA inspection and often a partial rewire before final.
The existing side entrance is usually a head start. If its stairs are too steep, it lacks headroom, or it sits too close to the property line for the required setbacks and guards, it may still need to be rebuilt.
What changes in the building code once you pass two units
The jump from a house with a basement suite to a triplex or fourplex is bigger than most owners expect. The relaxed provisions that make secondary suites affordable no longer apply. Every unit has to be separated from every other unit, and from shared spaces like a common stair or laundry room, by fire separations with a proper fire-resistance rating. Doors from units into shared corridors need to be rated, self-closing assemblies. Smoke alarms are interconnected across the building. Each unit needs a code-compliant way out, and the examiner will check travel distance to an exit.
Sound separation between units also comes into play, which affects how floors and walls are built. Plumbing and electrical services may need to be upsized. A 1960s house in Rexdale often has an older water service that was never meant to feed four kitchens and four bathrooms. Toronto Water may require a larger service connection, and that work runs on its own timeline. The garden suite needs its own servicing, usually tied in through the main house or run separately, and Toronto Fire Services expects a clear emergency access path from the street to the suite's door. On a wide lot with a side driveway, that path is rarely a problem. A carport or a fence gate in the wrong spot can still block it.
The TRCA check for lots near the Humber West Branch
Parts of Thistletown and the area around the Humber Arboretum back onto the West Humber and the Humber West Branch, with ravine slopes and floodplain that fall under the Toronto and Region Conservation Authority. If your property is inside TRCA's regulated area, you need TRCA's sign-off before Toronto Building will issue the permit. That sign-off might be a clearance letter, or it might be a full permit under the Conservation Authorities Act. Toronto's own Ravine and Natural Feature Protection bylaw may also apply to work and tree removal near the slope.
The house conversion itself usually raises few concerns with TRCA, because you're working inside an existing footprint. The garden suite is where it gets serious. It's new construction in the backyard, which is exactly where the slope or the floodplain starts. TRCA will look at the top of bank, the long-term stable slope line and required setbacks from both. On some lots that pushes the buildable area for a garden suite to almost nothing. Check TRCA's regulation mapping first, before you pay for a garden suite design. If the lot is close to a line, a geotechnical slope assessment may be required as part of the submission.
If your backyard ends at a ravine, find out where TRCA draws the line before you decide where the garden suite goes, not after.
Where Rexdale fourplex permits stall
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
Most of these applications don't fail. They slow down. The usual reasons are predictable:
- Zoning on the lot isn't what the owner thought. Most of Rexdale falls under the citywide Zoning By-law 569-2013, but some parcels still carry provisions from the former Etobicoke zoning, and the applicable law has to be confirmed before design.
- A rear addition or second storey exceeds the permitted depth, coverage or height, which turns a straight permit into a Committee of Adjustment application for minor variances and adds months.
- Trees. A mature tree in the backyard or on the city boulevard can block a garden suite location or require an Urban Forestry permit and an arborist report.
- Incomplete structural information for an existing house with no original drawings, which leads to examiner comments asking how loads are carried.
- Owners keeping tenants in place during construction without a plan for how fire separation work will happen around them.
A Preliminary Project Review or zoning certificate from Toronto Building before the full submission flags most of the zoning problems early. Our team has run multiplex and garden suite applications on streets across M9V and M9W, and the projects that move fastest are the ones where zoning, TRCA status and tree constraints are settled before the drawings are finalized.
Sequencing the work so the units come online
On a combined project, the house conversion and the garden suite are typically handled as related building permit files that are submitted together and reviewed in parallel. Toronto treats the garden suite as an ancillary building, and the examiner will check it against the main house, so the two sets of drawings need to agree on lot coverage, separation distance, servicing routes and the emergency access path.
A sensible build order goes like this. Do the servicing upgrades and any underpinning first. Then complete the fire separations and mechanical work in the house, so the basement and main floor units can pass final inspection. Build the garden suite last, once the yard is no longer a staging area. Inspections follow the stages: footings and foundation, framing, fire separation, insulation, plumbing, and final. Each unit gets its own final occupancy. PermitsHub prepares the drawings for both files and coordinates the examiner revisions and inspection bookings, so the two permits don't drift out of sync.
Development charges, parkland requirements and service connection costs depend on the unit types and the current rules. Provincial legislation exempts some additional residential units, but don't assume your whole project qualifies. Confirm the current position with the City for your specific configuration before you finalize the budget.
Do I Need a Permit?
What are you planning to build or renovate?
Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.