Do Permeable Pavers Count as Soft Landscaping Under Toronto Zoning?
Permeable pavers drain water, so plenty of homeowners assume Toronto counts them as soft landscaping. It doesn't. Under By-law 569-2013 a paver is a hard surface no matter how it drains, and a grass-grid driveway is still a driveway. Here's how the soft landscaping test really works, which surfaces count, and why a widened driveway or new patio can quietly turn an addition or garden suite into a Committee of Adjustment file.
Key Takeaways
- Toronto By-law 569-2013 treats permeable pavers as landscaping but not as soft landscaping, because the test is the surface material, not whether water passes through it.
- Grass-grid systems used for a driveway or parking space don't count at all, since driveways and parking spaces are excluded from landscaping entirely.
- Zoning examiners review the whole lot as it will exist after your project, so a patio, a widened driveway or a previous owner's interlock can push an addition or garden suite into a minor variance.
- The cheapest fix is usually design: shrink or relocate hard surfaces before you apply, and label every material on the site plan so the landscaping chart matches the drawings.
Pavers Versus Soft Landscaping
No. Under Toronto Zoning By-law 569-2013, permeable pavers count as landscaping but not as soft landscaping. The by-law defines soft landscaping as landscaping minus hard-surfaced areas like walkways, patios and decorative stonework, and a paver is a hard surface whether or not water drains through the joints. Grass-grid systems used as a driveway or parking pad don't count either, because driveways and parking spaces are excluded from landscaping altogether. If your design depends on "permeable" to clear the soft landscaping minimum, expect a zoning notice.
This catches people constantly. A homeowner puts in a beautiful permeable interlock patio, or widens the driveway with an eco-paver product the contractor called "green", and thinks nothing of it. Two years later they apply for a rear addition or a garden suite. The zoning examiner runs the landscaping numbers on the whole lot, and the project that looked as-of-right now needs a minor variance.
What By-law 569-2013 Actually Means by Soft Landscaping
The by-law uses two nested definitions, and you need both to make sense of your site plan. Landscaping is the broad category: trees, shrubs, grass, flowers, vegetables and other plantings, plus decorative stonework, walkways, patios, screening and similar landscape elements. It specifically leaves out driveways, parking spaces, ramps and buildings or structures. Soft landscaping is then defined as landscaping with the hard-surfaced elements taken back out. What remains is, in practice, ground with living things growing in it.
Notice what isn't in either definition: permeability. The zoning test is about what the surface is, not how it behaves in a rainstorm. Stormwater is a real city priority, but it's handled through separate programs and rules, like downspout disconnection and the stormwater requirements that apply to larger developments. A single-house zoning review doesn't give you credit for infiltration rates or the spec sheet from the paver manufacturer.
The examiner isn't asking whether water soaks in. They're asking whether something grows there. A permeable paver answers the first question and fails the second.
Surface by Surface: What Counts and What Doesn't
Here's how the common materials usually land on a Toronto zoning review. A couple of these sit in grey areas where individual examiners have read things differently, so treat those as "confirm before you build" rather than settled.
- Lawn, planting beds, vegetable gardens and mulched beds around trees: soft landscaping.
- Permeable interlock, open-joint pavers and porous concrete: landscaping when used as a walkway or patio, but not soft landscaping.
- Grass pavers or plastic grass-grid systems used as a driveway or parking space: not landscaping at all, because the use is parking.
- Grass-grid outside a driveway, such as a side path: usually treated as hard surface by examiners, so don't design around it counting as soft without confirming first.
- Gravel, river rock and decorative stone beds: hard landscaping, since decorative stonework is named in the definition.
- Artificial turf: typically not accepted as soft landscaping because nothing is growing; confirm with Toronto Building if your plan relies on it.
- Wood or composite decks: a structure, not landscaping, and the ground underneath generally isn't counted as soft.
- Ribbon driveways with a planted centre strip: the driveway is usually measured at full width, so the grass between the wheel tracks rarely helps your numbers.
How the Percentages Get Measured on Your Lot
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
The landscaping requirements in the residential zones are split between the front yard and the rear yard, and the front yard rules change with lot frontage. Narrow lots get the tightest restrictions on how much of the front yard can be anything other than landscaping, and wider lots get a slightly different formula. The front yard is measured across the full width of the lot, from the front lot line to the main front wall of the house. The rear yard runs from the rear main wall to the rear lot line.
On Committee of Adjustment notices, the two figures we see most often for detached and semi-detached houses are a requirement that 75 percent of the required front yard landscaping be soft landscaping, and that 50 percent of the rear yard be soft landscaping. Don't assume those apply to you without checking. Your zone, your frontage and any site-specific exception can change the numbers, and some properties are still governed in part by a former municipal by-law, such as the old North York or Etobicoke by-laws, where 569-2013 doesn't fully apply. The zoning map and the exceptions list on the City's site are the starting point, and a Preliminary Project Review or a zoning check before you design will settle it.
The small things that eat your soft landscaping
On a narrow lot the driveway is rarely the whole problem. It's the walkway to the front door, the concrete landing at the porch steps, the air conditioner pad, the window wells, the stone border along the bed. On the 5 to 7 metre semis we work on in Leslieville, East York and the Junction, those pieces alone can take the front yard from compliant to deficient. Every one of them gets subtracted from soft landscaping, and examiners do measure them.
Three Projects Where This Turns Into a Variance
Rear additions
An addition pushes the rear main wall back, which shrinks the rear yard. If your patio stays the same size, it now makes up a bigger share of a smaller yard, and the soft landscaping percentage drops even though you didn't add a single paver. Owners are often surprised that an addition can fail landscaping without any landscaping work at all. The fix is usually to rebuild the patio smaller as part of the same project and show it that way on the site plan.
Garden suites
Garden suites have their own rear yard soft landscaping requirement under the garden suite provisions, measured after the suite is built, with a lower threshold on narrow lots. The suite itself takes a large bite out of the yard, and then you need a clear path from the street for fire access, which most people pave. Add the existing patio and a small deck at the suite entrance, and the remaining green space shrinks fast. We see more garden suite files tripped up by soft landscaping and lot coverage than by height or setbacks.
Driveway widening and front yard parking
Widening a driveway is a zoning issue twice over. The by-law limits driveway width, and the extra paved area comes straight out of front yard landscaping. A wider curb cut needs approval from Transportation Services, and front yard parking pads are regulated separately under the Municipal Code. Plenty of driveways in Scarborough and Etobicoke have been widened informally over the years, and nobody notices until a building permit application puts a current survey in front of an examiner.
The Existing Conditions Trap
Zoning review looks at the lot as it will exist when your project is finished, not just the new work. If a previous owner paved over half the backyard, that paving shows up on your survey and it goes into the calculation. The examiner will list the shortfall on the zoning notice even if your addition doesn't touch that area.
Owners sometimes argue the paving is legal non-conforming. That only works if you can show the condition existed lawfully before the rule that it now breaks, and with backyard interlock that's very hard to prove. Old surveys, aerial photos and prior permit drawings can help, but more often the realistic options are to remove some hard surface and replant, or to fold the deficiency into a variance application with the rest of the project.
The patio you inherited is your patio as far as the examiner is concerned. If it's on the survey, it's in the math.
Redesign First, Variance Second
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
A soft landscaping shortfall found at the design stage is usually cheap to fix. Found after a zoning notice, it costs you a resubmission. Found at the Committee of Adjustment, it costs months. So before you accept a variance, look at whether the numbers can be fixed on paper:
- Shrink the patio, or replace part of it with a planted bed rather than more paving.
- Narrow the front walkway or switch to stepping stones set in planting, accepting that the stones themselves still get deducted.
- Pull the air conditioner pad and garbage storage onto an area that's already hard surface.
- Remove paving the previous owner added that you don't actually use.
- Keep the garden suite access path to the width it needs to be and no wider.
If the design genuinely can't work without the extra hard surface, the minor variance route through the Committee of Adjustment is well worn. The panel applies the four tests in the Planning Act, and modest soft landscaping variances are often approved, particularly when the deficiency is small and planting is shown elsewhere on the lot. Urban Forestry comments on files near trees, and neighbours do raise drainage and flooding concerns, especially on streets that have had basement flooding. A landscape plan showing what's planted and where helps more than an argument about permeable pavers, which panels have heard many times.
Timelines and application fees change, so confirm current figures with the City before you plan around a hearing date. At PermitsHub we run a landscaping check during the zoning review on every addition and garden suite before drawings go further, because catching a few square metres of patio early is the difference between a straight permit and a hearing.
What the Zoning Examiner Wants to See on the Site Plan
Examiners verify landscaping from your site plan, so the drawing has to make the calculation easy and honest. Vague drawings get zoning notices even when the lot actually complies, because the examiner can't confirm it.
- A landscaping chart listing front yard area, front yard landscaping, front yard soft landscaping, rear yard area and rear yard soft landscaping, with percentages.
- Distinct hatching for soft landscaping, hard landscaping and driveway or parking, with a legend.
- Every surface labelled by material, for example "permeable pavers (hard landscaping)" rather than just "pavers".
- Existing surfaces to remain and surfaces to be removed shown clearly, so the proposed condition is obvious.
- Dimensions that tie back to a current survey, not an old one from before the last owner's renovation.
The quickest way to earn a zoning notice is to label permeable pavers as soft landscaping in the chart. The examiner will reclassify them, recalculate, and send the drawings back. When PermitsHub prepares permit drawings, the chart is built from the measured surfaces and checked against the zoning numbers before submission, so revisions come back on design questions rather than arithmetic.