PermitsHubPermitsHub

By Area

Will a 1950s Guildwood Bungalow in M1E Carry a Second-Storey Addition?

Most 1950s bungalows in Guildwood and West Hill were built on concrete block walls and modest strip footings meant for one storey and a roof. Before Toronto Building will issue a permit to go up, an engineer has to prove the foundation can take the extra load. Here's how test pits work, where these houses usually fall short, and when a ravine lot pulls TRCA into the process.

By PermitsHub Team9 min read

Key Takeaways

  • Toronto Building will not issue a second-storey permit on a 1950s Guildwood or West Hill bungalow until a professional engineer confirms the existing foundation can carry the new loads, and that confirmation usually depends on test pits.
  • The weak points are usually the small pad footings under the basement's centre beam posts, not the exterior walls, so many houses need targeted upgrades rather than full underpinning.
  • The original ceiling joists were sized for a ceiling, not a floor, so plan on a new floor structure for the second storey even if the footings pass.
  • Lots backing onto the Highland Creek ravine or near the Scarborough Bluffs may need a TRCA permit and a slope stability report, and that review can take longer than the building permit itself.

Test the Footings First

Sometimes, but almost never without proof. A typical 1950s bungalow in Guildwood or West Hill sits on hollow concrete block walls over plain concrete strip footings, and those footings were sized to carry one storey and a roof. Toronto Building will not issue a permit for a second storey until a professional engineer confirms the existing footings, foundation walls and basement posts can take the added load. That confirmation usually means digging test pits. Some houses pass as they are. Many need targeted upgrades, most often at the interior posts. A smaller number need underpinning or piles along an exterior wall. If the lot backs onto the Highland Creek ravine or sits near the bluffs, the Toronto and Region Conservation Authority may need to sign off too.

What Is Actually Under a Postwar Guildwood or West Hill Bungalow

The houses on the streets off Guildwood Parkway, Livingston Road, Morningside and Manse Road were built fast, in large numbers, by builders working to the standards of the day. The pattern repeats from house to house. You'll find hollow concrete block foundation walls, usually 8 inch block, sitting on a poured strip footing that's often unreinforced. Down the middle of the basement runs a steel beam or a built-up wood beam, held up by two or three steel posts. Under each post is a pad footing, and that pad is sometimes not much more than a thickened patch of the basement slab.

The attic tells the rest of the story. Ceiling joists are typically 2x4 or 2x6, spanning to that centre beam, and the roof is often a low-slope gable or hip. None of that framing was meant to carry people, furniture or another set of walls.

Soil varies more than people expect. Much of Scarborough sits on glacial till, which is generally good bearing material, but closer to the ravines you get sand, silt and pockets of fill where lots were regraded during construction. Two houses on the same street can sit on different ground. And original drawings almost never survive. The City's building records may hold an old permit card, but footing dimensions are rarely on it.

Why the Plan Examiner Will Ask for an Engineer's Letter

For new houses, the Ontario Building Code gives prescriptive footing sizes that depend on how many storeys the footing supports and what soil it sits on. Going from one storey to two moves you into a different row of that table. Your existing footing was built for the first row, and the examiner can't assume it meets the second. So the standard comment on a second-storey application is a request for a letter from a professional engineer. That letter confirms the existing foundation is adequate for the new loads, or it comes with a design for reinforcing it.

The examiner will also want the new load path shown on the structural drawings. That means where the second-storey walls land, where the roof loads come down, and where any new point loads hit the basement. A new post under a new beam can concentrate a lot of weight on one small spot. The engineer has to account for every one of those spots, not just the overall weight of the addition.

On these bungalows the exterior walls usually hold up fine. The surprise is almost always in the basement, under the steel posts nobody has looked at since 1956.

Test Pits: How the Footing Actually Gets Verified

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

An engineer can't sign a letter based on a guess, so someone has to dig and expose the footing. Outside, that means a hand-dug or small-machine pit against the foundation wall, taken down past the bottom of the footing. In Toronto that's usually well over a metre deep because footings sit below frost depth. Inside, it means saw-cutting the basement slab at one or more posts to see what's actually under them. The engineer either attends or works from measured photos with a tape in the frame.

  • Footing width, thickness, and how far it projects past the face of the block wall
  • Depth of the underside of the footing below finished grade
  • Whether there's any reinforcing steel, and the condition of the concrete
  • Condition of the block wall: cracking, bowing, crumbling mortar, water staining
  • Size and depth of the pad footings under the interior posts
  • Soil type and firmness at the bearing level, and whether there's fill

A few practical things trip people up. Book utility locates through Ontario One Call before anyone digs outside. Check for large trees nearby, because excavating inside the protection zone of a protected tree can need a permit under the City's tree bylaws. Many Guildwood lots have mature oaks and maples within a few metres of the house. Pick your digging location with the engineer so one pit answers the most questions, usually at a wall carrying a roof bearing point. And backfill and compact the pit properly, or you'll be chasing a settled flower bed and a wet basement corner for years.

If the soil looks questionable, the engineer may ask for a geotechnical opinion. That's more common near the ravine edge and on lots that were clearly built up with fill.

Where These Houses Usually Come Up Short, and the Usual Fixes

Interior post pads

This is the most common failure point. The centre beam already carries half the floor and ceiling of the bungalow. Add a second floor and a new roof, and the posts may see their load go up sharply. The fix is usually straightforward. You cut out the slab around each post, pour a properly sized new pad footing, and install new posts. It's messy and it disrupts a finished basement, but it's a contained piece of work.

Exterior strip footings

When the exterior footing is too narrow or too shallow, the options are underpinning in short sections, widening the footing with new concrete doweled into the old, or helical piles screwed down beside the wall and bracketed to the footing. Piles are often favoured near ravines, where soil at shallow depth is soft or variable. Underpinning a full perimeter is the biggest cost driver of anything on this list. That's why engineers often try to arrange the second storey so its loads come down where the footing is strongest.

The block walls themselves

Hollow block has limited capacity for concentrated loads. Where a new beam or post lands on top of a block wall, the engineer may call for filling the block cores with grout under that bearing point. A wall that's already bowing inward from soil pressure needs to be dealt with before anything goes on top of it.

Ceiling joists that were never a floor

Even when the footings pass, the original ceiling joists almost never work as floor joists. Plan on a new floor system for the second storey. That usually means engineered joists laid alongside or above the old ceiling framing, sometimes with a new beam. This also changes your floor-to-floor height, which matters for the zoning height limit.

Ravine and Bluff Lots: When TRCA and the City's Ravine Bylaw Get Involved

A lot of Guildwood and West Hill backs onto valley land. Highland Creek and its branches cut through Colonel Danforth Park and Morningside Park, and the southern edge of Guildwood runs to the Scarborough Bluffs. If your property falls inside the area regulated by the Toronto and Region Conservation Authority under Ontario Regulation 41/24, development there needs a TRCA permit. That includes an addition, and sometimes the excavation for one. Toronto Building will generally want that clearance before it issues your building permit.

TRCA looks at where your house sits relative to the top of bank and the hazard limits, and it often asks for a slope stability assessment by a geotechnical engineer. A second storey that stays within the existing footprint is generally an easier conversation than a ground-floor rear extension toward the slope. It's still a conversation, though, and it adds time. The City's Ravine and Natural Feature Protection By-law can apply on top of that if you're grading, dumping fill or removing trees in a protected area. The time to find this out is before you pay for drawings, not after the examiner's first comment letter.

We've dug test pits and handled TRCA submissions on Guildwood and West Hill lots where the backyard drops away into the valley. The pattern holds: the geotechnical report for TRCA and the footing assessment for the building permit can often come from the same site visit, if you plan for it.

Zoning in M1E and M1C Can Settle the Design Before the Footings Do

Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.

Structure is only half the question. Most of these lots are zoned residential detached under the City's Zoning By-law 569-2013, though some Scarborough properties are still governed by older former-Scarborough bylaws. Look at your zone label for the maximum building height, the main wall height limits on the sides, and any floor space or coverage limits. A second floor with a new engineered floor system and a reasonable roof pitch can push close to those limits faster than people expect. Low-slope roofs help, and so do keeping ceiling heights sensible.

If the design needs relief, it goes to the Committee of Adjustment, Scarborough panel, for a minor variance. On big Guildwood lots, the objections usually aren't about overlook. They're about how a boxy two-storey reads on a street of low, wide bungalows. A partial second storey set back from the front wall often lands better with neighbours and puts less load on the weakest parts of the foundation.

The Order That Saves Time and Money

  • Get a zoning check on your lot and confirm whether it's inside the TRCA regulated area
  • Have the engineer review the house and choose test pit locations
  • Dig, measure, backfill, and get the engineer's findings in writing
  • Design the addition around what the foundation can carry, with any upgrades drawn in
  • Submit architectural and structural drawings together, with TRCA clearance if required
  • Respond to examiner comments, then schedule footing or underpinning inspections before framing starts

Most delays we see come from doing these steps out of order. A homeowner pays for a full design, then the test pit comes back with a narrow, shallow footing, and half the drawings get redone. At PermitsHub we prepare the permit drawings with the engineer's foundation findings built in from the first draft, then handle the submission and the examiner's revision rounds. Footings are the first question, not the last.

Do I Need a Permit?

1
›
2
›
3
›
4

What are you planning to build or renovate?

Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.

Related Reading

More in this category

By Area

FAQ

Related questions

Get started

Tell us about your project.

Free, no-pressure quote within one business day.

● Flat-rate quotes - no surprise fees

● Revisions included until approval

● Most enquiries responded to same day

Free Home Permit QuoteNo commitment · 30 sec
1
2
3

What are you building?

SCROLL TO SEE ALL 20 PERMIT TYPES

Prefer to call? 647-961-4070
CALL NOWFree Home Permit Quote30 SECONDS - NO COMMITMENT