By Area
Fence Height Rules for Side-Split Lots in Bathurst Manor M3H
On a Bathurst Manor side-split the yard can drop a full storey between the driveway and the back patio, and Toronto's fence by-law measures height from the ground the fence sits on. That one detail decides whether your privacy screen is legal, needs an exemption, or gets a complaint. Here's how it plays out on M3H lots.
Key Takeaways
- Toronto's Fence By-law (Municipal Code Chapter 447) generally allows 1.2 metres in a front yard and 2.0 metres in side and rear yards, measured from the ground where the fence stands, not from your patio or deck.
- On a stepped M3H yard, a fence on top of a retaining wall or along a grade change can read as compliant from your side and too tall from your neighbour's, so design to the lower grade or get the measurement confirmed before you build.
- A privacy screen on a raised deck or upper patio is usually measured from the ground below, which is why many deck screens in Bathurst Manor technically exceed fence limits and need an exemption or a redesign.
- Lots backing onto the West Don valley may fall under Toronto's Ravine and Natural Feature Protection By-law, TRCA regulation, or the tree by-laws, and post holes alone can trigger a permit requirement.
Fences On Stepped Lots
On a Bathurst Manor or Wilson Heights side-split, a fence can generally be up to 1.2 metres in the front yard and 2.0 metres in the side and rear yards under Toronto's Fence By-law (Municipal Code Chapter 447). The catch is that height is measured from the ground where the fence stands, not from your patio, deck or the top of a retaining wall. On a lot where the yard steps down half a storey, that measuring point decides whether a privacy fence is legal or needs a fence exemption from North York Community Council.
Most of the fence disputes we see in M3H don't involve anyone deliberately building too high. They involve a homeowner who measured from the wrong spot. Side-splits put the measuring problem everywhere: at the front where the garage sits lower than the entry, along the side where the yard steps, and at the back where a patio sits on fill behind a wall.
Why the 2.0 metre rule gets complicated on a 1950s side-split
Bathurst Manor was built out mostly in the 1950s and early 1960s, and the builders loved the side-split. The house sits across a slope, with the garage and rec room on the low side, the living level at grade on the high side, and bedrooms half a storey up. The lots follow the same logic. A typical backyard on the crescents between Bathurst and Wilmington has a lower lawn, an upper patio near the kitchen door, and either a slope or a block retaining wall between them.
Chapter 447 was written with a flat lot in mind. You pick a point along the fence, measure from the ground to the top, and stay under the limit. On a stepped lot the ground under one fence run can change by a metre or more, and the two sides of the property line are often at different elevations because one neighbour built up a patio in 1978 and the other never did.
A fence that measures 1.8 metres from your patio can measure 2.6 metres from your neighbour's lawn. The by-law officer will measure from wherever the complaint came from.
Working out where your front yard actually ends
The 1.2 metre front yard limit applies to the area between the front lot line and the front wall of the house. On a side-split that front wall isn't one straight line. The garage block often projects forward, the entry sits back, and the upper bedroom level may overhang both. Homeowners frequently assume that anything beside the house counts as side yard and put up a 1.8 metre panel next to the driveway, only to find that the section ahead of the main front wall is legally front yard.
The practical approach is to take your survey, draw a line across the lot at the front wall of the house, and treat everything street-side of that line as capped at 1.2 metres. Where the wall steps, check against the portion of the house nearest the street. If you don't have a survey, the one from your purchase file usually works for this, even if it's decades old, as long as the house and lot lines haven't changed.
Corner lots on the crescents
Bathurst Manor and Wilson Heights have a lot of curved crescents, which produces odd-shaped corner lots where the side yard runs along a street. These lots carry two extra layers. First, the flanking side yard faces a street, and neighbours and the city both pay more attention to tall solid fences there. Second, Chapter 447 restricts fence height near intersections and driveways so drivers can see pedestrians and oncoming cars. On a curving street that sight area can reach further into the yard than people expect.
We don't recommend guessing at the visibility rules from a neighbour's fence, because plenty of older fences in the area predate the current by-law or were never compliant. Confirm the exact sight triangle dimensions with the city for your corner before you set posts.
Stepped yards and retaining walls: which ground counts
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
This is where most M3H fence problems start. There are three common situations, and each behaves differently.
- A fence that steps down the slope in panels: each panel is measured from the ground beneath it, so the high end of each stepped panel is usually the tightest point. Racked (sloped) panels avoid the tall triangular gap but follow the same measuring logic.
- A fence set on top of a retaining wall: the wall is often counted as part of the overall height when the officer measures from the lower side, so a 1.0 metre wall with a 1.5 metre fence on top can read as 2.5 metres from the neighbour's yard.
- A fence set back from the top of the wall on your upper level: the measurement is taken from the ground at the fence line, which gives you more height, but you lose the strip between the fence and the wall edge and may still need a guard at the drop.
When the grade differs on either side of a shared lot line, the safest design assumption is that height will be measured from the lower side. If your design only works when measured from the high side, get that interpretation confirmed in writing from the city before you build. A verbal answer from a contractor who has built fences in Vaughan for twenty years isn't the same thing.
When the wall itself needs attention
Many of the original block and timber walls in Bathurst Manor are leaning or bulging by now. If your fence project includes rebuilding a wall, the wall may need its own building permit and engineered design under the Ontario Building Code, particularly when it's over 1 metre and sits near a property line, a public sidewalk or a walkway people use to reach the house. A drop at the top of a wall can also call for a guard, which has its own height and climbability rules separate from the fence by-law. Plan the wall and fence together, because changing grade at the line changes the fence measurement too.
Privacy screens on decks and upper patios
The upper level of a side-split usually looks straight into the neighbour's yard, so people want screening right at the deck edge. A 1.8 metre screen on a deck that's 1.2 metres off the ground looks modest from the deck. Measured from the ground below, which is how fence height is generally assessed, the top sits around 3 metres up. That is well past the 2.0 metre limit.
Deck screens can also run into zoning. Toronto's Zoning By-law 569-2013 regulates platforms, their height above grade and their setbacks, and a raised deck with walls on it can start to behave like a structure the examiner has to look at more closely. If the deck itself needs a building permit, the screen becomes part of the drawings, and that's where we see screens pulled back or redesigned at review. When PermitsHub prepares deck drawings for split-level homes in this area, we show the screen height relative to the ground and the deck surface on the elevations so the examiner isn't left to guess.
Options that tend to work better: a lower screen combined with planting, a freestanding screen set back from the lot line on the lower level, a pergola with partial slats, or locating the sitting area where the upper-level view is naturally blocked by the house.
Lots backing onto the West Don valley
Some Bathurst Manor and Wilson Heights lots back onto the West Don ravine system and its tributary slopes. On these lots height is only part of the question. Toronto's Ravine and Natural Feature Protection By-law (Municipal Code Chapter 658) regulates tree injury and removal, placing fill and changing grade inside the mapped protected area. Augering post holes, cutting roots, or levelling a strip to run a fence straight can all fall within that, depending on where the fence goes.
Lots close to the valley may also sit inside the Toronto and Region Conservation Authority's regulated area under Ontario Regulation 41/24. TRCA looks at slope stability and erosion, and a fence anchored near the top of bank, or a retaining wall rebuild in that zone, may need their sign-off. Separately, the city's private tree by-law protects larger trees on private land and city-owned trees on the boulevard. Post holes inside a protected tree's root zone can require a permit even on a lot nowhere near the ravine.
On a ravine lot, the fence height usually isn't what stops the project. The post holes are.
Check the city's ravine protection mapping and TRCA's regulation mapping for your address before you sign a fence contract. If you're inside either line, the fence location, footing type and any grading belong in the plan from the start. Helical piles or surface-mounted posts sometimes solve a problem that concrete footings create.
When to apply for a fence exemption instead of building and hoping
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
Chapter 447 lets you apply for an exemption when your situation doesn't fit the standard limits. For M3H addresses, the decision goes to North York Community Council, and the application is circulated so neighbours get a chance to comment. Exemptions are a reasonable route on side-split lots precisely because the grade problem is real: a council member can see why a fence on a stepped yard needs to be taller at one end to give the same privacy a flat lot gets automatically.
What helps an exemption: a survey or measured site plan showing grades on both sides, elevations of the proposed fence with heights marked from each side, photos showing the sightline you're trying to block, and ideally a signed note from the affected neighbour. What hurts it: an already-built fence, a complaint history, a solid wall-like design facing a street, or anything that blocks sightlines at a corner. Check the current application requirements and fee with the city, as they change.
We've worked on a fair number of split-level properties between Sheppard and Wilson, and the pattern is consistent. The homeowners who measure grade on both sides first, talk to the neighbour, and apply before building rarely end up in a dispute. The ones who build first and explain later are the ones who end up cutting panels down. If your lot combines a stepped yard with a ravine edge or a crumbling wall, PermitsHub can review the survey and grades with you and sort out which approvals actually apply before anyone digs.
A pre-build checklist for M3H side-split fences
- Pull your survey and mark where the front wall line falls, so you know which runs are capped at 1.2 metres.
- Measure existing grade on both sides of every proposed run, especially at retaining walls and slope changes.
- On a corner lot, confirm the sight triangle dimensions with the city before setting posts.
- Treat any deck or patio screen as measured from the ground below unless you've confirmed otherwise.
- Check ravine protection mapping, TRCA regulated area mapping and nearby protected trees before planning post holes.
- Call Ontario One Call for utility locates. Older M3H streets have gas and hydro services running where you wouldn't guess.
- If the design doesn't fit the limits, apply for an exemption first and talk to the neighbour before the application circulates.
Do I Need a Permit?
What are you planning to build or renovate?
Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.