Permits 101
Can I Do My Own Architectural Drawings for a Permit in Ontario?
Yes, Ontario lets you draw your own permit set for a house you own, with no BCIN and no architect. The exemption ends sooner than most people think: at beams the span tables don't cover, at energy compliance, and at properties you rent out. Here is exactly where the line sits and what plan examiners send back on owner-drawn sets.
Key Takeaways
- The Ontario Building Code lets an owner design work on their own house without BCIN registration, and you claim this on the designer information schedule of the permit application.
- The exemption covers who may draw. It does not cover what the drawings must show, so anything outside the Part 9 prescriptive tables, such as steel beams, point loads or underpinning, still needs an engineer's seal.
- Energy efficiency compliance under SB-12 and work on properties you don't personally own and occupy are where owner-drawn applications most often run into trouble or fall outside the exemption.
- Most owner-drawn sets get bounced for missing information rather than bad design: site plan dimensions, limiting distance for windows, stair and guard details, header sizes and fire separations.
Drawing Your Own Permit
Yes. In Ontario you can prepare and submit your own permit drawings for a house you own, without being BCIN-qualified and without hiring an architect. The Ontario Building Code carves out an exemption for owners designing their own building. That exemption only answers one question, though: who is allowed to hold the pencil. It doesn't relax a single technical requirement. Structural elements outside the code's prescriptive tables still need an engineer's seal. Energy efficiency still has to be demonstrated properly. And the exemption is built around an individual designing for their own house, not a landlord or investor drawing up units for tenants.
I've watched plenty of homeowners do this successfully, usually on decks, basement finishes and small rear additions. I've also watched owner-drawn sets go through three or four rounds of examiner comments while the contractor's start date slid by months. The difference is rarely drafting skill. It's knowing where your exemption stops and what an examiner needs to see on the page.
How the owner exemption works on the permit application
Ontario requires most people who design buildings for permit to be registered with the province under the Building Code Identification Number system, the BCIN you see stamped on designer drawings. Architects and professional engineers are covered by their own licensing. The Building Code then lists exemptions, and one of them is the owner designing work on their own building.
In practice you claim it on the designer information schedule that comes with the building permit application. Toronto Building calls it Schedule 1, and most GTA municipalities use the same provincial form. Instead of entering a BCIN, you indicate that you're the owner and that the design is exempt from the qualification and registration requirements. The examiner checks that the applicant name matches the property owner on title. If it doesn't, expect a question before anyone looks at your drawings.
One thing that surprises people: the exemption applies to the design, not the review. Your drawings go to the same plan examiner, against the same code, as a set from a twenty-year designer. Nobody gives an owner-drawn set the benefit of the doubt. If anything, examiners read them more closely, because they've learned where the gaps tend to be.
The three places the exemption stops
Structure that leaves the Part 9 tables
Houses are designed under Part 9 of the Building Code, which gives you prescriptive span tables for joists, rafters, lintels and built-up wood beams. If your design fits inside those tables, you can size members yourself and show your work. Once you step outside them, someone has to calculate it, and in residential work that means a professional engineer who stamps the drawing or provides sealed calculations. Your owner exemption doesn't extend to engineering, because that's a separate profession under separate legislation.
The common triggers in GTA renovations:
- Removing a load-bearing wall to open a kitchen, especially when the new beam is steel or LVL, or carries a point load from above.
- Any second storey or added load on an existing foundation, where someone has to confirm the footings can take it.
- Underpinning or lowering a basement, which needs an engineered sequence and almost always an engineer's site reviews.
- Engineered floor and roof systems (I-joists, trusses) where the manufacturer's sealed layout has to be part of the submission.
- Retaining walls over the height threshold in the code, and anything that supports a public sidewalk or a neighbour's grade.
In older Toronto stock (the semis in Leslieville, the wartime bungalows in Scarborough, the 1920s detached houses in the west end) the existing framing often doesn't match modern tables anyway. Examiners know this. Show a new beam bearing on an old wall with no information about what's below it, and they'll ask how the load gets to the footing.
Energy efficiency compliance
New houses, additions and many substantial renovations have to demonstrate compliance with the energy efficiency requirements in the Building Code, primarily Supplementary Standard SB-12. That usually means an energy efficiency design summary filed with the permit, showing which compliance path you've chosen and the insulation values, window performance, mechanical equipment and ventilation that go with it. A prescriptive package is something an organized owner can work through. The performance path, which relies on energy modelling, needs a qualified modeller, and it's often the only practical route when an addition has a lot of glass or an existing house is hard to bring up to the prescriptive numbers.
This is where owner-drawn additions most often stall. Wall sections show batt insulation that doesn't hit the required value, windows have no listed performance rating, and nobody has thought about how the new space is heated or ventilated. Heat loss calculations and duct design are a separate submission item that many municipalities expect for additions. Confirm the exact requirements for your project with your municipality, because they vary with the scope and with how much of the existing house you're touching.
Properties you don't own and live in
The exemption exists so a person can design their own home. It isn't meant to let an unregistered person run a design practice under a different name. If you're drawing a basement apartment in a rental property you own through a corporation, a garden suite on an investment lot, or a set for your brother-in-law's house, you're well outside what the exemption was meant to protect, and some of those scenarios clearly need a registered designer. How each municipality treats corporate ownership or a property you own but don't occupy varies, so confirm with the building department before you invest weeks in drafting. The conservative reading is the one that won't get your application held up.
The owner exemption tells the examiner who is allowed to draw. It tells them nothing about whether the drawing is complete, and incomplete is what gets sent back.
What plan examiners send back on owner-drawn sets
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
I've read a lot of examiner comment letters on homeowner submissions, and the same items come up again and again. Very few are design failures. Almost all are missing information the examiner can't approve without.
- Site plan not based on a survey, missing setbacks to every lot line, or no lot coverage and gross floor area statistics for the zoning review.
- No established grade or proposed elevations, which matters for height calculations under the zoning bylaw and for basement walkouts.
- Windows on side walls with no limiting distance or spatial separation calculation, a frequent issue on narrow Toronto lots where the side yard is under a metre and a half.
- Stairs without rise, run, headroom and width dimensions, and guards without heights or a detail showing they resist climbing.
- Headers and lintels drawn but not sized, or sized with no reference to the span table used.
- Wall, floor and roof sections missing, or showing assemblies with no insulation values, vapour barrier or air barrier.
- Secondary suites without fire separation ratings, rated door details, interconnected smoke alarm and carbon monoxide alarm locations, or separate ventilation information.
- Drawings not to scale, not dimensioned, or with existing and proposed work on the same sheet with no way to tell them apart.
Each round of comments sends your file back into the review queue. In a busy season that's weeks, not days, for each revision cycle. The time cost of a thin first submission is usually far bigger than the time you saved drawing it yourself.
Projects where drawing it yourself is realistic
Some projects are a good fit for an owner who's comfortable with a scale ruler or basic CAD and willing to read Part 9 carefully. The common thread is that the structure stays inside the prescriptive tables, the energy scope is limited, and zoning is straightforward.
- A deck that needs a permit because of its height or because it's attached, built with standard footings and joists sized from the tables.
- A basement finish that isn't creating a second unit and isn't moving any bearing walls.
- A detached accessory building like a larger shed or a simple garage with conventional framing.
- Interior alterations that open non-bearing walls or reconfigure a bathroom with new plumbing.
Even here, read your zoning bylaw before you draw. A deck that's fine under the Building Code can still breach a setback or a platform height limit under Toronto's Zoning By-law 569-2013 or the local bylaw in Vaughan, Markham or Mississauga. If you need a minor variance, you're now in front of the Committee of Adjustment with neighbours reading your plans, and a clear, professional set carries more weight at a hearing than people expect.
Projects where owner drawings usually cost more than they save
The calculation changes on anything involving new foundations, added storeys, structural openings, second units or heritage properties. Rear additions and second storeys combine every hard edge at once: engineered structure, energy compliance, zoning statistics, often a variance. A secondary suite brings fire separations, egress windows, sound transmission and separate heating questions. A house in a heritage conservation district adds a heritage review layer before Toronto Building will issue anything.
On these projects the biggest cost driver is rarely the drawings. It's delay: a contractor who moves on to another job, financing that's tied to a permit date, a basement left open while revisions bounce back and forth. Owners often find that a stalled permit costs them meaningfully more than the design fee they were trying to avoid.
A middle route: your drawings, professional gaps filled
Have a project in mind? Get an honest, no-pressure permit review from PermitsHub.
You don't have to choose between doing everything and doing nothing. A lot of homeowners draw the floor plans and elevations themselves, then bring in an engineer for the beam and foundation pieces and a qualified designer for the energy and HVAC submission. The owner exemption covers your part, and the professionals seal theirs. What matters is that the set reads as one coordinated package, with beam sizes on your plans matching the engineer's letter and wall sections matching the energy summary.
If you've drafted a set and aren't sure it will survive the first review, PermitsHub does pre-submission zoning and code checks on owner-prepared drawings, flagging the items examiners will ask about before the clock starts. When an owner set has bounced, we also take over revisions and respond to the examiner's comment letter directly. Either way, go into the application knowing which parts of your project the exemption actually covers, and line up the engineer early if your design leaves the span tables. That one decision does more to keep a permit moving than anything else on this list.
Do I Need a Permit?
What are you planning to build or renovate?
Ready to move forward? PermitsHub handles permit drawings, submission, and revisions - flat-rate, GTA-wide.